Asphalt Plant Regulation, B.C. Reg. 217/97
Section 3
Registration requirements
Cite as Asphalt Plant Regulation, B.C. Reg. 217/97, s. 3 · last amended October 28, 2019 · read from BC Laws on November 17, 2026
The text
(1) Every owner or operator must register and provide the information required by subsection (2) within 30 days after acquiring the ownership of a hot-in-place asphalt recycling plant or hot mix asphalt plant.
(2) The registration information must be delivered to a director and must include all of the following:
(a) the company name under which the owner operates;
(b) the name, mailing address and telephone number of the owner;
(c) for a hot-in-place asphalt recycling plant, the serial number of each machine train unit;
(d) for a hot mix asphalt plant, the serial number and a description of each major piece of equipment comprising the plant;
(e) for a hot-in-place asphalt recycling plant, the heating process used to soften the pavement;
(f) for a new hot-in-place asphalt recycling plant, the design gaseous discharge flow rate of each machine train unit stack and, for an existing plant, the most recent set of stack monitoring results;
(g) for a new hot mix asphalt plant, the design gaseous discharge flow rate from each aggregate dryer and, for an existing plant, the most recent set of aggregate dryer stack monitoring results;
(h) the maximum plant production rate in tonnes per hour;
(i) for a hot mix asphalt plant, the maximum percentage of recycled asphalt pavement to be used, if any;
(j) the type of fuel or fuels used by the plant and the fuel consumption rate or rates, in litres per hour or cubic metres per hour, at the maximum plant production rate;
(k) a description of the emission control equipment and the relevant operating parameters.
(3) If any of the information provided under subsection (2) changes, the owner or operator must, within 60 days after the change, deliver to a director particulars of the change.
(4) An owner or operator who operates in British Columbia outside the Metro Vancouver Regional District must
(a) pay an application fee, as prescribed in the Permit and Approval Fees and Charges Regulation, B.C. Reg. 299/92, for a new plant which did not have a permit on June 27, 1997,
(b) pay in arrears, in respect of each calendar year of operation, an annual charge, as prescribed in the Permit and Approval Fees and Charges Regulation, based on production during that calendar year as subsequently reported under paragraph (c), and
(c) provide in writing, by January 31 of each year to a director, a statement which indicates the amount of asphalt produced from the registered hot-in-place or hot mix asphalt plant during the previous calendar year while operating in British Columbia.
Read the Asphalt Plant Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.