Asphalt Plant Regulation, B.C. Reg. 217/97
Section 18
Cutback asphalt
Cite as Asphalt Plant Regulation, B.C. Reg. 217/97, s. 18 · last amended October 28, 2019 · read from BC Laws on November 17, 2026
The text
(1) A person must not, between May 1 and September 30,
(a) use cutback asphalt on a roadway as a prime or tack coat agent, or
(b) use cutback asphalt mix on a roadway for the filling of potholes or emergency road repair if
(i) an operating hot mix asphalt plant is located within a 25 kilometre radius of the work site or maintenance depot, and
(ii) more than 5 tonnes of asphalt mix is required.
(2) A director may order additional restrictions on the use of cutback asphalt.
Read the Asphalt Plant Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.