Code of Practice for Soil Amendments, B.C. Reg. 210/2007

Section 7

If soil amendments contain domestic sewage

Cite as Code of Practice for Soil Amendments, B.C. Reg. 210/2007, s. 7 · last amended October 9, 2025 · read from BC Laws on November 17, 2026

The text

(1) Soil amendments that are described in paragraph (b) of the definition in section 1 and include domestic sewage must not be applied to land unless the groundwater table at the time of application is at least 1 metre below the surface of the land. (2) Soil amendments referred to in subsection (1) must not be applied within (a) 30 metres from a drinking water source, irrigation well, lake, river, stream, dwelling or boundary with land zoned for residential or recreation uses, (b) 20 metres from a major public road, and (c) 10 metres from a minor public road, other than a logging road. (3) If soil amendments referred to in subsection (1) having a fecal coliform density greater than or equal to 1 000 MPN per gram by dry weight of total solids are applied to an application site, (a) the land owner must not allow planting on the application site of food crops of which only the parts growing above ground are harvested for human consumption for at least 18 months after the application, (b) the land owner must not allow planting on the application site of food crops of which parts growing below ground are harvested for human consumption for at least 38 months after the application, and (c) the discharger must ensure that a sign, at least 1 m2 in size and legible to a person approaching the application site at each point of access, is posted for 38 months after the application of the soil amendments. (4) A sign required under subsection (3) (c) must set out all the following: (a) a description of the application site; (b) that residuals from the primary or secondary treatment of pulp or paper mill liquid waste with a fecal coliform density greater than or equal to 1 000 MPN per gram of total solids dry weight basis have been applied to the site and the date of that application; (c) that the public should avoid (i) entering the application site for 38 months after the application, (ii) ingesting plant material grown on the application site within 18 months after the application if the part of the plant ingested grows above the surface of the land, and (iii) ingesting plant material grown on the application site within 38 months after the application if the part of the plant ingested grows below the surface of the land; (e) that domestic animals should not be permitted to graze on the application site for 60 days after the application; (f) the name and telephone number of a person who may be contacted for additional information.
Read the Code of Practice for Soil Amendments on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.