Direction No. 4 to the British Columbia Utilities Commission, B.C. Reg. 203/2013

Section 1

Definitions

Cite as Direction No. 4 to the British Columbia Utilities Commission, B.C. Reg. 203/2013, s. 1 · last amended October 12, 2013 · read from BC Laws on November 17, 2026

The text

In this direction: “Act” means the Utilities Commission Act; “applicable customer” means a residential customer of the authority who receives services from the authority at an applicable premises; “applicable premises” means a building, structure or equipment of a customer if the building, structure or equipment is connected to the electric distribution system and has an electricity meter; “electricity balance analysis” has the same meaning as in the Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010; “failed installation costs” means costs related to attendance at a premises to install a legacy meter, radio-off meter or smart meter where installation is not carried out because of either an objection made by a customer or an obstruction; “infrastructure costs” means costs related to the installation and operation of communications infrastructure in areas where the installation of one or more legacy meters or radio-off meters hinders or would hinder the transmission of information among smart meters; “investigation costs” means costs related to investigating and identifying the location of unmetered loads referred to in section 4 (1) (a) (iv) of the Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010, in areas where the installation of one or more legacy meters reduces or would reduce the accuracy of electricity balance analyses performed to estimate the extent and location of those loads; “legacy meter” means an electricity meter, other than a smart meter or a radio-off meter, that is of a type in use by the authority; “program costs” means costs related to the installation and operation of, and services related to, legacy meters or radio-off meters at applicable premises, including, without limiting this, costs related to (a) computer hardware and software systems respecting the use and operation of legacy meters or radio-off meters, (b) the conversion of radio-off meters into smart meters for future customers, and (c) attendance at an applicable premises to install a legacy meter or radio-off meter; “radio-off meter” means a smart meter adjusted so that the meter's components that transmit data by radio are deactivated; “smart meter” means a meter that (a) meets the requirements set out in section 2 of the Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010, and (b) has components that transmit data by radio and those components are activated.
Read the Direction No. 4 to the British Columbia Utilities Commission on BC Laws ↗

Made under Utilities Commission Act, RSBC 1996, c. 473.