Vehicle Dismantling and Recycling Industry Environmental Planning Regulation, B.C. Reg. 200/2007

Section 2

Requirement for an environmental management plan

Cite as Vehicle Dismantling and Recycling Industry Environmental Planning Regulation, B.C. Reg. 200/2007, s. 2 · last amended September 1, 2007 · read from BC Laws on November 17, 2026

The text

(1) A person that operates or plans to operate a facility that dismantles more than 5 wet vehicles in a calendar year must (a) either (i) have an environmental management plan for waste management, reduction or prevention, or (ii) be a member of an association that has an environmental management plan for waste management, reduction or prevention, and (b) register with a director under section 3. (2) A person must comply with subsection (1), (a) if operating the facility on or before September 1, 2008, on or before that date, and (b) otherwise, before beginning to operate the facility. (3) A plan for the purposes of this section must (a) be approved by a qualified professional, (b) describe how each of the following wastes will be removed from wet vehicles at facilities to which the plan applies: (i) ozone depleting substances and other halocarbons; (ii) oils, brake fluids, solvents, fuels and other hydrocarbons; (iii) antifreeze; (iv) lead and lead-acid batteries; (v) tires; (vi) mercury switches; (vii) windshield washer fluid, (c) describe how each waste referred to in paragraph (b) will be stored, treated, recycled or disposed of in compliance with the Act and applicable regulations, and (d) set out (i) management processes for minimizing or eliminating the discharge of wastes to the environment, and (ii) a contingency plan documenting procedures to be followed during an emergency. (4) Within 3 months after each 5th anniversary of the date their registration is effective under section 3 (2), a person operating a facility for which there is a plan specific to the facility must (a) review the plan, (b) amend or replace the plan if necessary to ensure that that person has a plan that complies with subsection (3), and (c) have the reviewed, amended or replacement plan approved by a qualified professional. (5) Within 3 months after September 1, 2013 and within 3 months of each fifth anniversary of that date, an association that has a plan for 2 or more facilities must (a) review the plan, (b) amend or replace the plan if necessary to ensure that the association has a plan that complies with subsection (3), and (c) have the reviewed, amended or replacement plan approved by a qualified professional.
Read the Vehicle Dismantling and Recycling Industry Environmental Planning Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.