Spill Contingency Planning Regulation, B.C. Reg. 186/2017
Section 2
Specified quantity
Cite as Spill Contingency Planning Regulation, B.C. Reg. 186/2017, s. 2 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) The specified quantity in relation to the transportation of a regulated substance is the following, as applicable:
(a) in the case of transportation through a pipeline, the greatest of
(i) the quantity of the largest historic spill from the pipeline,
(ii) the volume of the largest breakout tank, or battery of breakout tanks, without a secondary containment system, and
(iii) the quantity calculated in accordance with subsection (2);
(b) in the case of transportation by railway, the greater of
(i) the maximum quantity that could be transported by a single rail car operated by the regulated person, and
(ii) 20% of the maximum quantity that could be transported by a train operated by the regulated person;
(c) in the case of transportation on a highway, the maximum quantity that could be transported by a single motor vehicle, including trailers, if any, attached to the motor vehicle operated by the regulated person.
(2) For the purposes of subsection (1) (a) (iii), the quantity is to be calculated as follows: quantity = (detection time + shutdown time) x flow rate + line drainage where detection time = the maximum time that is likely to be required to detect an unintentional release from the pipeline; shutdown time = the maximum time that is likely to be required to shut down the pipeline; flow rate = the maximum flow rate of the pipeline; line drainage = the maximum quantity that could be contained by the pipeline between any 2 shutoff valves.
Read the Spill Contingency Planning Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.