Private Managed Forest Land Council Regulation, B.C. Reg. 182/2007

Section 31

Reforestation of areas where timber harvested or destroyed

Cite as Private Managed Forest Land Council Regulation, B.C. Reg. 182/2007, s. 31 · last amended January 24, 2023 · read from BC Laws on November 17, 2026

The text

(1) In this section: “completion of timber harvesting” means the date that timber harvesting within a cutblock is concluded and is determined by (a) the date the area is declared as a cutblock in an annual declaration, or (b) if an area is not included in a declaration, a date that does not exceed two consecutive operating seasons from the commencement of harvesting in the cutblock; “crop tree” means a tree that (a) is of a commercial species that is consistent with the species of trees specified in the management commitment for use in reforestation, and (b) is unencumbered by pathogens; “disturbed area” means all or part of private managed forest land where (a) timber harvesting has been completed within a cutblock, or (b) timber was destroyed but does not include an area occupied by roads referred to in section 13 or logging trails referred to in section 14 (1); “restock” means to establish a stand of trees that contains at least (a) 400 crop trees per hectare reasonably well distributed across the disturbed area if the stand is on the Coast, and (b) 600 crop trees per hectare reasonably well distributed across the disturbed area if the stand is in the Interior; “successfully regenerated stand” means a stand of trees (a) that contains at least (i) 400 crop trees per hectare reasonably well distributed across the disturbed area if the stand is on the Coast, and (ii) 600 crop trees per hectare reasonably well distributed across the disturbed area if the stand is in the Interior, and (b) where the crop trees exceed the height of competing vegetation within 1 m of the crop tree by (i) 50% if the area is on the Coast, and (ii) 25% if the area is in the Interior. (2) This section does not apply to an owner of a disturbed area if (a) the area where the timber was harvested or destroyed is a contiguous area that is under 1 ha in size, or (b) the trees remaining on the area meet the definition of a successfully regenerated stand. (3) If all or part of private managed forest land becomes a disturbed area, an owner or a contractor, employee or agent of the owner must reforest the disturbed area by (a) restocking the disturbed area within 5 years of the completion of timber harvesting activity on the cutblock, or the date the timber was destroyed, as applicable, and (b) establishing a successfully regenerated stand on the disturbed area within 15 years of the completion of timber harvesting activity on the cutblock, or the date the timber was destroyed, as applicable. (4)-(5) Repealed. [B.C. Reg. 55/2019, s. 7 (b).] (6) Nothing in this section requires an owner to reforest a disturbed area if the timber on the area was (a) destroyed and the disturbed area is not sufficiently productive to support a successfully regenerated stand, or (b) harvested or destroyed and the disturbed area becomes occupied by buildings or other structures or installations.
Read the Private Managed Forest Land Council Regulation on BC Laws ↗

Made under Private Managed Forest Land Act, SBC 2003, c. 80.