Forest Planning and Practices Regulation, B.C. Reg. 14/2004

Section 74

Peak flow

Cite as Forest Planning and Practices Regulation, B.C. Reg. 14/2004, s. 74 · last amended January 1, 2026 · read from BC Laws on November 17, 2026

The text

(1) A person who builds a bridge across a stream or installs a culvert in a stream for the purpose of constructing or maintaining a road must ensure that the bridge or culvert is designed to pass the highest peak flow of the stream that can reasonably be expected within the return periods specified below for the length of time it is anticipated the bridge or culvert will remain on the site: Anticipated period the bridge or culvert will remain on the site Peak flow return period For a bridge or culvert that will remain on site for up to 3 years 10 years For a bridge that will remain on site from 3 to 15 years 50 years For a bridge that will remain on site for over 15 years 100 years For a culvert that will remain on site for over 3 years 100 years For a bridge or culvert within a community watershed that will remain on site for over 3 years 100 years (2) A person may build a bridge that will not conform to the requirements of subsection (1) if (a) the bridge will pass the flow that will occur during the period the bridge remains on the site, (b) the construction of the bridge occurs during a period of low flow, and (c) the bridge, or a component of the bridge that is vulnerable to damage by high flow, is removed before any period of high flow begins. (3) A person may install a culvert that will not conform to the requirements of subsection (1) if (a) the installation is temporary and the person does not expect to subsequently install a replacement culvert at that location, (b) the stream in which the culvert is being installed is not a fish stream, (c) the culvert will pass the flow that will occur during the period the culvert remains on the site, (d) the installation of the culvert occurs during a period of low flow, and (e) the culvert is removed before any period of high flow begins.
Read the Forest Planning and Practices Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.