Forest Planning and Practices Regulation, B.C. Reg. 14/2004

Section 64

Maximum cutblock size

Cite as Forest Planning and Practices Regulation, B.C. Reg. 14/2004, s. 64 · last amended January 1, 2026 · read from BC Laws on November 17, 2026

The text

(1) If an agreement holder other than a holder of a minor tenure harvests timber in a cutblock, the holder must ensure that the size of the net area to be reforested for the cutblock does not exceed (a) 40 hectares for areas located in the Kootenay Boundary Forest Region, South Coast Forest Region, Thompson Okanagan Forest Region or West Coast Forest Region, as established by the Administrative Boundaries Regulation, and (b) 60 hectares for areas located in the Cariboo Forest Region, Northeast Forest Region, Omineca Forest Region or Skeena Forest Region, as established by the Administrative Boundaries Regulation. (2) Subsection (1) does not apply to an agreement holder where (a) timber harvesting (i) is being carried out on the cutblock (A) to recover timber damaged by fire, insect infestation, wind or other similar events, or (B) for sanitation treatments, or (ii) is designed to be consistent with the structural characteristics and the temporal and spatial distribution of an opening that would result from a natural disturbance, and (b) the holder ensures, to the extent practicable, that the structural characteristics of the cutblock after timber harvesting has been substantially completed resemble an opening that would result from a natural disturbance. (3) Subsection (1) does not apply if the timber harvesting that is being carried out on the cutblock retains 40% or more of basal area of the stand that was on the cutblock before timber harvesting. (4) Subsection (1) does not apply if no point within the net area to be reforested is (a) more than two tree lengths from either (i) the cutblock boundary, or (ii) a group of trees reserved from harvesting that is greater than or equal to 0.25 ha in size, or (b) more than one tree length from a group of trees reserved from timber harvesting that is less than 0.25 ha in size.
Read the Forest Planning and Practices Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.