Water Sustainability Act, SBC 2014, c. 15

Section 47

Remediation orders in relation to foreign matter in stream

Cite as Water Sustainability Act, SBC 2014, c. 15, s. 47 · read from BC Laws on November 17, 2026

The text

(1) An engineer may order a person who contravenes section 46 (1) [prohibition on introducing foreign matter into stream] to (a) stop the introduction of debris, refuse, carcasses, human or animal waste, pesticides, fertilizers, contaminants or other matter or substance into the stream, the stream channel or an area adjacent to the stream, (b) remove the debris, refuse, carcasses, human or animal waste, pesticides, fertilizers, contaminants or other matter or substance from the stream, the stream channel, the area adjacent to the stream or an aquifer that is hydraulically connected to the stream and to which the matter or substance has migrated, and (c) take measures, in accordance with the direction of the engineer, to remediate or mitigate the effects of the introduction. (2) If the engineer considers that the effects of an introduction described in subsection (1) (a) cannot be remediated, or cannot be fully remediated, at the location of the introduction, that engineer may order the person referred to in subsection (1) to take compensatory mitigation measures, in place of or supplemental to other remediation measures, on a different part of the stream into which the introduction was made. (3) The comptroller or a water manager may authorize the government or another person to take the actions necessary to comply with an order under subsection (1), and the person who contravened section 46 (1) is liable to the government or that other person, as applicable, for the costs of complying with the order if any of the following apply: (a) the person who is subject to an order under subsection (1) fails to comply with the order within the time specified in the order; (b) the person who contravened section 46 (1) cannot be identified or located after reasonable effort; (c) the comptroller or the water manager considers that failure to remediate or mitigate the introduction immediately may result in harm or damage to anything referred to in section 46 (1) (c) to (g). (4) Any expense reasonably incurred by a person in the exercise of authority provided under subsection (3), unless the person is acting on behalf of the government, may be recovered from the person to whom the order was directed as money paid for, and at the request of, that person. (5) If work is carried out under subsection (3) by or on behalf of the government, the costs to the government are a debt due to the government by the person to whom the order was directed and may be recovered in accordance with section 98 [recovery of amounts owing for work performed]. (6) This section does not limit the authority under section 91 [power of comptroller to authorize actions] or 93 [powers of engineers and officers].
Read the Water Sustainability Act on BC Laws ↗