Dormancy and Shutdown Regulation, B.C. Reg. 112/2019
Section 15
Type A sites
Cite as Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, s. 15 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
(1) A permit holder for type A sites that were not decommissioned by December 31, 2018 must decommission those sites as follows:
(a) Repealed. [B.C. Reg. 27/2026, Sch. 1, s. 11 (a).]
(b) by December 31, 2026, the permit holder must have decommissioned at least 2 or 70% of those sites, whichever is greater, unless there is only one site;
(c) by December 31, 2031, the permit holder must have decommissioned all of those sites.
(2) A permit holder for type A sites must assess each of those sites before the site is restored.
(3) A permit holder for type A sites must restore those sites as follows:
(a) Repealed. [B.C. Reg. 27/2026, Sch. 1, s. 11 (c).]
(b) by December 31, 2030, the permit holder must have restored at least 2 or 70% of those sites, whichever is greater, unless there is only one site;
(c) by December 31, 2036, the permit holder must have restored all of those sites.
(4) For the purposes of this section, if the result of taking a percentage of type A sites is not a whole number, the result is to be rounded
(a) to the nearest whole number, or
(b) if the result is equidistant between 2 whole numbers, to the greater of those numbers.
Read the Dormancy and Shutdown Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.