The text
(1) Repealed. [B.C. Reg. 33/2020, App. 1, s. 4 (a).]
(1.1) Subject to subsection (2.1), the minister may include no more than 144 units in the location of a drilling licence.
(2) Repealed. [B.C. Reg. 33/2020, App. 1, s. 4 (a).]
(2.1) If the location is wholly or partly in the Peace River Block, the minister may include in the location of a drilling licence no more than 144 units and quarter sections combined.
(3) Subject to a surrender under subsection (3.01), a continuation under subsection (5), (5.1) or (5.3) or an extension under subsection (7), a drilling licence expires as follows:
(a) in the case of a drilling licence that describes a location in Area 1 of Schedule 2, on the third anniversary of the date it was issued;
(b) in the case of a drilling licence that describes a location in Area 2 of Schedule 2, on the fourth anniversary of the date it was issued;
(c) in the case of a drilling licence that describes a location in Area 3 of Schedule 2, on the fifth anniversary of the date it was issued;
(d) in the case of a drilling licence that describes a location in 2 or more of the areas referred to in paragraphs (a) to (c), on the later of the applicable anniversaries.
(3.01) A drilling licence may be surrendered in whole or in part at any time.
(3.02) A surrender under subsection (3.01) must not result in a spacing area being divided.
(3.1) The holder of a drilling licence must pay the rent for the upcoming year under section 49.2 (1) of the Act on or before the anniversary of the date the drilling licence was issued.
(3.2) For the purposes of section 49.2 (2) of the Act, a drilling licence expires 60 days after the date the rent was due.
(3.3) Repealed. [B.C. Reg. 33/2020, App. 1, s. 4 (f).]
(4) A drilling licence commences on the date it is issued.
(5) A drilling licence must be continued once, for a period of one year, if the application
(a) is made before the end of the term, and
(b) is accompanied by the continuation fee and rent specified under section 6.5 (1) of the Petroleum and Natural Gas Act Fee, Rental and Work Requirement Regulation.
(5.1) The minister may grant one or more continuations of a drilling licence each for a period of one year or less if
(a) an application is made to the director before the end of the current term of the licence and is accompanied by the rent specified under section 6.5 (2) of the Petroleum and Natural Gas Act Fee, Rental and Work Requirement Regulation,
(b) an application to drill an earning well has been made to the regulator at least 30 days before the end of the current term of the licence, and
(c) drilling of an earning well has been delayed pending completion of
(i) an environmental or socioeconomic study,
(ii) a public hearing,
(iii) a planning or consultation process,
(iv) a correction of unsafe conditions at the well site, or
(v) the provision of safe access to the well site.
(5.2) Repealed. [B.C. Reg. 189/2005, s. 3.]
(5.3) The minister may continue a drilling licence for a period of one year if
(a) the drilling licence has previously been continued under subsection (5),
(b) the application for the continuation is made during the term of a current continuation of the licence under
(i) subsection (5),
(ii) subsection (5.1), or
(iii) this subsection,
(c) the application for the continuation is accompanied by the rent specified under section 6.5 (2) of the Petroleum and Natural Gas Act Fee, Rental and Work Requirement Regulation, and
(d) the drilling licence is included in a special project designated under section 75 of the Energy Resource Activities Act for the development or production of coalbed gas.
(5.4) A continuation under subsection (5.3) must not
(a) apply to a zone that does not include the coal-bearing stratum or strata subject to the special project referred to in subsection (5.3) (d),
(b) be given if 5 continuations under subsection (5.3) have been given previously for the same drilling licence, or
(c) include land that is not included in the special project referred to in subsection (5.3) (d).
(6) A licensee may assign or sublet all or a portion of the licensee's interest in a drilling licence but may not assign or sublet that interest on the basis of all or a portion of any area in the location.
(7) The expiry date of a drilling licence is extended to the date the drilling of a well eligible for designation as an earning well is completed if
(a) the drilling licence would otherwise expire before the drilling of the well is completed,
(b) drilling of the well has reached at least 150 metres on the date the drilling licence would otherwise expire,
(c) drilling of the well is being diligently conducted, and
(d) the drilling licence has previously been continued under subsection (5).
(8) If an expiry date is extended under subsection (7), no other well may be commenced in the location of the drilling licence after the expiry date that applied immediately before the extension under subsection (7) except as provided under subsection (9).
(9) If the expiry date of a drilling licence is extended under subsection (7) and drilling of the well must be discontinued for mechanical reasons, a new well may be commenced in its place during the period of the extension under subsection (7).
(10) The expiry date of a drilling licence that has been grouped, under section 4.1, with another drilling licence extended under subsection (7) is extended to the expiry date of that other drilling licence if the first licence
(a) would otherwise expire before the drilling of the well is completed, and
(b) has previously been continued under subsection (5).
Read the Petroleum and Natural Gas Drilling Licence and Lease Regulation on BC Laws ↗