Building Envelope Renovation Regulation, B.C. Reg. 240/2000

Section 16

Prohibited provisions and copy of amended contract to the registrar

Cite as Building Envelope Renovation Regulation, B.C. Reg. 240/2000, s. 16 · last amended March 6, 2024 · read from BC Laws on November 17, 2026

The text

(1) A warranty provider must not include in a materials and labour warranty or water penetration warranty any provision that requires a holder (a) to sign a release before repairs are performed under the materials and labour warranty or water penetration warranty, or (b) to pay a deductible for the repair of any defect covered by the materials and labour warranty or water penetration warranty. (1.1) Subsection (1) (b) does not apply to a window that (a) is a component of a building envelope, (b) is removed from the building envelope for the purpose of a building envelope renovation, (c) is re-installed as part of the building envelope renovation, and (d) causes damage by unintended water penetration to the building. (2) All exclusions, as permitted by this regulation, must be stated in the materials and labour warranty or water penetration warranty. (3) Not less than 30 days before putting into public use a new or amended document or contract form intended for use by holders and containing the terms and conditions of a materials and labour warranty or water penetration warranty, a warranty provider must submit the document or contract form to the registrar.
Read the Building Envelope Renovation Regulation on BC Laws ↗

Made under Insurance Act, RSBC 2012, c. 1.