Code of Practice for Soil Amendments, B.C. Reg. 210/2007

Section 11

Sampling and analysis

Cite as Code of Practice for Soil Amendments, B.C. Reg. 210/2007, s. 11 · last amended October 9, 2025 · read from BC Laws on November 17, 2026

The text

(1) A discharger must ensure that sampling and analysis of soil amendments described in paragraphs (a) and (b) of the definition in section 1 are carried out by a qualified professional when the earlier of the following occurs: (a) 1 000 tonnes dry weight of soil amendments are produced at the facility, or (b) one year has passed since the facility started to produce the soil amendments or 1 year has passed since the last sampling and analysis, as applicable. (2) A director may require more frequent sampling and analysis than is required under subsection (1) if the director considers this necessary or advisable in the circumstances. (3) An analysis under this section must be made in accordance with the British Columbia Environmental Laboratory Manual: 2005 — for the Analysis of Water, Wastewater, Sediment, Biological Materials and Discrete Ambient Air Samples, as amended from time to time (Victoria, 2005), published by the minister, or by suitable alternative procedures authorized by a director.
Read the Code of Practice for Soil Amendments on BC Laws ↗

Made under Public Health Act, SBC 2008, c. 28.