Gas Safety Regulation, B.C. Reg. 103/2004

Section 26

Installation permit is also authorization

Cite as Gas Safety Regulation, B.C. Reg. 103/2004, s. 26 · last amended May 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) Unless otherwise provided in the installation permit, if the holder of an installation permit complies with section 34, an installation permit issued for regulated work in respect of a gas system is sufficient authorization for the use of the gas system. (2) An installation permit for any of the following is authorization to begin the installation or reinstallation of the appliance but not to test or use the appliance until it has passed inspection or an inspection has been waived by the regulatory authority on conditions specified by the regulatory authority: (a) any direct-fired non-recirculating type make-up heater; (b) a conversion burner, except if it is to be installed in a single family dwelling and has an input of 120 kW or less; (c) a commercial or industrial conversion burner; (d) any direct fired equipment; (e) a forced draft appliance over 409 600 BTU/hour. (3) Despite subsection (2) a provincial safety manager may include in an installation permit permission to ignite or operate a regulated product before inspection under conditions specified in the permit.
Read the Gas Safety Regulation on BC Laws ↗

Made under Safety Standards Act, SBC 2003, c. 39.