Forest and Range Practices Act, SBC 2002, c. 69
Section 2.45
Mandatory amendments to forest operations plan
Cite as Forest and Range Practices Act, SBC 2002, c. 69, s. 2.45 · read from BC Laws on November 17, 2026
The text
(1) Unless the regulations provide otherwise, the holder of a forest operations plan must propose and submit, for approval by the minister under section 2.39 and in accordance with this section, an amendment to the plan if any of the following applies:
(a) the area specified in the plan as the location of a proposed cutblock or proposed road is affected by an amendment to any of the following enactments:
(i) this Act;
(ii) the regulations;
(iii) a prescribed enactment;
(b) the holder is required by the regulations to propose and submit the amendment to the plan.
(2) An amendment required under this section must address the following, as applicable:
(a) an amendment to an enactment referred to in subsection (1) (a);
(b) a regulation referred to in subsection (1) (b).
(3) An amendment required under this section must be submitted within the following period, as applicable:
(a) in the case of a plan amendment required under subsection (1) (a), the longer of
(i) 6 months from the date that the enactment referred to in subsection (1) (a) is amended, and
(ii) the period, if any, specified in the enactment referred to in subsection (1) (a);
(b) in the case of a plan amendment required by a regulation referred to in subsection (1) (b), a period of 6 months or longer specified in the regulation.
(4) In prescribed circumstances, the minister may exempt a person from a requirement to amend a plan under subsection (1).
Read the Forest and Range Practices Act on BC Laws ↗