Drinking Water Protection Act, SBC 2001, c. 9

Section 32

Plan development process

Cite as Drinking Water Protection Act, SBC 2001, c. 9, s. 32 · read from BC Laws on November 17, 2026

The text

(1) The minister may, by order, establish the process by which a proposed drinking water protection plan for a designated area is to be developed. (2) Without limiting subsection (1), an order under that subsection may (a) establish who is to be responsible for preparing the proposed plan, (b) establish the terms of reference for the plan, or authorize the preparation of some or all of the terms of reference subject to approval by the minister, and (c) require the establishment of a technical advisory committee in relation to development of the plan. (3) The terms of reference for a proposed drinking water protection plan must include (a) the purpose of the plan, (b) the issues to be addressed in the plan, (c) a process for public and stakeholder consultation, and (d) a time limit for completing the plan. (4) As examples of terms of reference that may be established for a plan, but without limiting the issues that may be addressed, the terms of reference for a drinking water protection plan may include one or more of the following: (a) whether changes are required to a water supply system, including measures respecting its water source, intake, treatment, storage, transmission and distribution; (b) whether the operating permit for a water supply system should include additional provisions respecting monitoring, standards or other requirements; (c) consideration of the economic and social costs and benefits of addressing risks through treatment, source protection or other means; (d) whether an implementation regulation under any of sections 35 to 38 should be made. (5) In preparing a proposed drinking water protection plan, consideration must be given to the results or progress of Provincial government or local government strategic, operational and land use or water use planning processes within the designated area. (6) A proposed drinking water protection plan may be prepared in conjunction with a proposed water sustainability plan under the Water Sustainability Act. (7) The minister may, by order, extend the time for completing a proposed drinking water protection plan whether or not the time previously set has expired.
Read the Drinking Water Protection Act on BC Laws ↗