Canadian Energy Regulator Onshore Pipeline Regulations, SOR/99-294

Section 10

Cite as Canadian Energy Regulator Onshore Pipeline Regulations, SOR/99-294, s. 10 · current to July 24, 2025 · regulation last amended September 27, 2022

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) When an HVP pipeline is to be situated in a Class 1 location and within 500 m of the right-of-way of a railway or paved road, a company shall develop a documented risk assessment to determine the need for heavier wall design, taking into account such factors as pipeline diameter and operating pressure, HVP fluid characteristics, topography and traffic type and density of the traffic on the railway or paved road. (2) A company shall submit a documented risk assessment to the Regulator when required to do so.
Read the Canadian Energy Regulator Onshore Pipeline Regulations on the Justice Laws Website ↗

Made under N-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.