Canada Oil and Gas Installations Regulations, SOR/96-118
Section 51
Cite as Canada Oil and Gas Installations Regulations, SOR/96-118, s. 51 · current to July 24, 2025 · regulation last amended October 6, 2020
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Subject to subsection (2), the air gap for an offshore installation, except for a surface platform, shall be determined in accordance with section 4.8 of Canadian Standards Association CAN/CSA-S471-92, General Requirements, Design Criteria, the Environment, and Loads.
(2) The air gap for a column-stabilized mobile offshore platform may be calculated assuming the platform is at survival draft and at its lowest position relative to sea level, as determined from its motion characteristics.
(3) Every surface mobile offshore platform shall have sufficient freeboard, taking into consideration the environmental criteria and loads at the drill or production site determined under section 45.
(4) Every fixed offshore production platform shall have sufficient freeboard to prevent ice rubble or waves from flowing over the side of the platform unless it is designed to withstand the loads due to water and ice without major damage, under the most severe conditions as determined pursuant to section 45.
Read the Canada Oil and Gas Installations Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.