Canada Oil and Gas Installations Regulations, SOR/96-118

Section 45

Cite as Canada Oil and Gas Installations Regulations, SOR/96-118, s. 45 · current to July 24, 2025 · regulation last amended October 6, 2020

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) For the purposes of undertaking the analyses referred to in section 41, the determination of environmental criteria and loads on an offshore installation shall be made in accordance with sections 5 and 6.5 to 6.13 of Canadian Standards Association CAN/CSA-S471-92, General Requirements, Design Criteria, the Environment, and Loads. (2) For the purposes of undertaking the analyses referred to in section 41, permanent loads, operational loads and accidental loads shall be determined in accordance with sections 6.2, 6.3 and 6.4, respectively, of Canadian Standards Association CAN/CSA-S471-92, General Requirements, Design Criteria, the Environment, and Loads. (3) For the purposes of undertaking the analyses referred to in section 41, for offshore installations, load combinations shall be determined in accordance with section 6.14 of Canadian Standards Association CAN/CSA-S471-92, General Requirements, Design Criteria, the Environment, and Loads.
Read the Canada Oil and Gas Installations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.