Canada Oil and Gas Installations Regulations, SOR/96-118
Section 42
Cite as Canada Oil and Gas Installations Regulations, SOR/96-118, s. 42 · current to July 24, 2025 · regulation last amended October 6, 2020
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The design of an offshore installation shall not involve the use of any design method, material, joining technique, or construction technique that has not previously been used in comparable situations, unless
(a) there have been engineering studies or prototype or model tests that demonstrate the adequacy of the method, material or technique; and
(b) the operator implements a performance monitoring and inspection program that is designed to permit the determination of the correctness of the method, material or technique.
Read the Canada Oil and Gas Installations Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.