Regulation of Canada

Nova Scotia Offshore Petroleum Drilling Regulations

Regulations Respecting the Drilling for Petroleum in the Nova Scotia Offshore Area

Statute Watch

Get an alert when a bill in Parliament would change this regulation, and every time it moves.

Citation
SOR/92-676
Current to
July 24, 2025
Last amended
December 31, 2009
Made under
Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1988, c. 28
Official text
Justice Laws Website ↗

Bills in Parliament that would change it 0

No bill we hold would amend or repeal it.

Contents 188 entries

Short Title

1 [Repealed, SOR/2009-317, s. 104]

Interpretation

2 [Repealed, SOR/2009-317, s. 104]

Application

3 [Repealed, SOR/2009-317, s. 104]

Submission of Information

4 [Repealed, SOR/2009-317, s. 104]

General

Application for Authorization

5 [Repealed, SOR/2009-317, s. 104]

Conditions of Drilling Program Authorization

6 [Repealed, SOR/2009-317, s. 104]

Defective or Experimental Equipment

7 [Repealed, SOR/2009-317, s. 104] 8 [Repealed, SOR/2009-317, s. 104]

Support Craft

9 [Repealed, SOR/2009-317, s. 104] 10 [Repealed, SOR/2009-317, s. 104]

Standby Vessel

11 [Repealed, SOR/2009-317, s. 104] 12 [Repealed, SOR/2009-317, s. 104]

Pressure Vessels

13 [Repealed, SOR/2009-317, s. 104]

Hazards

14 [Repealed, SOR/2009-317, s. 104]

Requirements for Drilling Installations

15 [Repealed, SOR/2009-317, s. 104] 16 [Repealed, SOR/2009-317, s. 104] 17. to 20 [Repealed, SOR/95-188, s. 3]

Standards For Drilling Equipment

21 [Repealed, SOR/2009-317, s. 104]

Meteorological Forecasts

22 [Repealed, SOR/2009-317, s. 104]

Safety and Escape Arrangements

23 [Repealed, SOR/2009-317, s. 104] 24 [Repealed, SOR/95-188, s. 4] 25 [Repealed, SOR/2009-317, s. 104]

Medical and Rescue Facilities

26 [Repealed, SOR/2009-317, s. 104] 27 [Repealed, SOR/2009-317, s. 104] 28 [Repealed, SOR/2009-317, s. 104]

Electrical Equipment

29 [Repealed, SOR/95-188, s. 6] 30 [Repealed, SOR/2009-317, s. 104]

Lighting

31 [Repealed, SOR/2009-317, s. 104] 32. to 44 [Repealed, SOR/95-188, s. 8]

Cranes

45 [Repealed, SOR/2009-317, s. 104]

Blowout Preventer System Requirements

46 [Repealed, SOR/2009-317, s. 104] 47 [Repealed, SOR/2009-317, s. 104]

Casing

48 [Repealed, SOR/2009-317, s. 104] 49 [Repealed, SOR/2009-317, s. 104] 50 [Repealed, SOR/2009-317, s. 104] 51 [Repealed, SOR/2009-317, s. 104] 52 [Repealed, SOR/2009-317, s. 104] 53 [Repealed, SOR/2009-317, s. 104] 54 [Repealed, SOR/2009-317, s. 104] 55 [Repealed, SOR/2009-317, s. 104]

Cementation of Casing

56 [Repealed, SOR/2009-317, s. 104] 57 [Repealed, SOR/2009-317, s. 104] 58 [Repealed, SOR/2009-317, s. 104]

Marine Riser

59 [Repealed, SOR/2009-317, s. 104]

Drilling Fluid System

60 [Repealed, SOR/2009-317, s. 104]

Air, Gas and Foam Drilling

61 [Repealed, SOR/2009-317, s. 104]

Testing Equipment

62 [Repealed, SOR/2009-317, s. 104]

Operating Manuals

63 [Repealed, SOR/2009-317, s. 104]

Contingency Plans

64 [Repealed, SOR/2009-317, s. 104]

Misuse of Safety and Fire-fighting Equipment

65 [Repealed, SOR/2009-317, s. 104]

Approval to Drill or Approval to Re-enter a Well or to Drill a Test Hole

Notification

66 [Repealed, SOR/2009-317, s. 104]

Prohibition

67 [Repealed, SOR/2009-317, s. 104]

Application

68 [Repealed, SOR/2009-317, s. 104]

Approval Conditions

69 [Repealed, SOR/2009-317, s. 104]

Suspension or Revocation of Approval

70 [Repealed, SOR/2009-317, s. 104]

Location of Well

71 [Repealed, SOR/2009-317, s. 104]

Evidence of Financial Responsibility

72 [Repealed, SOR/2009-317, s. 104]

Operational Requirements

Drilling of a Well

73 [Repealed, SOR/2009-317, s. 104]

Surveys

74 [Repealed, SOR/2009-317, s. 104]

Safety Zone

75 [Repealed, SOR/2009-317, s. 104]

Availability of Regulations

76 [Repealed, SOR/2009-317, s. 104]

Display of Authorizations, Approvals and Critical Procedures

77 [Repealed, SOR/2009-317, s. 104]

Drilling Equipment Tests

78 [Repealed, SOR/2009-317, s. 104]

Well Control Equipment

79 [Repealed, SOR/2009-317, s. 104] 80 [Repealed, SOR/2009-317, s. 104] 81 [Repealed, SOR/2009-317, s. 104] 82 [Repealed, SOR/2009-317, s. 104]

Safety Valves

83 [Repealed, SOR/2009-317, s. 104]

Choke Manifold

84 [Repealed, SOR/2009-317, s. 104]

Flow Lines from Wells

85 [Repealed, SOR/2009-317, s. 104] 86 [Repealed, SOR/2009-317, s. 104]

Flare Line

87 [Repealed, SOR/2009-317, s. 104]

Pressure Tests of Casing and Blowout Preventers

88 [Repealed, SOR/2009-317, s. 104] 89 [Repealed, SOR/2009-317, s. 104] 90 [Repealed, SOR/2009-317, s. 104] 91 [Repealed, SOR/2009-317, s. 104]

Coal and Mineral Deposits

92 [Repealed, SOR/2009-317, s. 104]

Cementation

93 [Repealed, SOR/2009-317, s. 104] 94 [Repealed, SOR/2009-317, s. 104]

Waiting on Cement Time

95 [Repealed, SOR/2009-317, s. 104]

Maximum Pressure during Well Stimulation

96 [Repealed, SOR/2009-317, s. 104]

Formation Leak-Off Test

97 [Repealed, SOR/2009-317, s. 104]

Monitoring of Drilling

98 [Repealed, SOR/2009-317, s. 104] 99 [Repealed, SOR/2009-317, s. 104]

Volume of Drilling Fluid

100 [Repealed, SOR/2009-317, s. 104] 101 [Repealed, SOR/2009-317, s. 104]

Pressure Transition Zone

102 [Repealed, SOR/2009-317, s. 104]

Directional and Deviation Surveys

103 [Repealed, SOR/2009-317, s. 104]

Plugging Part of a Well

104 [Repealed, SOR/2009-317, s. 104]

Suspension of Drilling Operations

105 [Repealed, SOR/2009-317, s. 104]

Inspections and Tests of Equipment

106 [Repealed, SOR/2009-317, s. 104]

Inspection of Hoisting Equipment

107 [Repealed, SOR/2009-317, s. 104]

Electrical Equipment

108 [Repealed, SOR/2009-317, s. 104]

Crane Operations

109 [Repealed, SOR/2009-317, s. 104]

Quantities of Consumables

110 [Repealed, SOR/2009-317, s. 104]

Bulk Handling of Fuel and Consumables

111 [Repealed, SOR/2009-317, s. 104]

Waste Material

112 [Repealed, SOR/2009-317, s. 104] 113 [Repealed, SOR/2009-317, s. 104] 114 [Repealed, SOR/2009-317, s. 104]

Radio and Support Craft Procedures

115 [Repealed, SOR/2009-317, s. 104] 116 [Repealed, SOR/2009-317, s. 104] 117 [Repealed, SOR/2009-317, s. 104]

Moving Drilling Units

118 [Repealed, SOR/2009-317, s. 104]

Anchors

119 [Repealed, SOR/2009-317, s. 104]

Stability

120 [Repealed, SOR/2009-317, s. 104]

Safety and Training of Personnel

General

121 [Repealed, SOR/2009-317, s. 104]

General Safety

122 [Repealed, SOR/2009-317, s. 104] 123 [Repealed, SOR/2009-317, s. 104]

Training of Personnel

124 [Repealed, SOR/2009-317, s. 104]

Safety Drills

125 [Repealed, SOR/2009-317, s. 104] 126 [Repealed, SOR/2009-317, s. 104]

Protection against Poisonous Gas

127 [Repealed, SOR/2009-317, s. 104]

Safety Instructions

128 [Repealed, SOR/2009-317, s. 104]

Rest Period

129 [Repealed, SOR/2009-317, s. 104]

Protective Clothing

130 [Repealed, SOR/2009-317, s. 104]

Safety Belts

131 [Repealed, SOR/2009-317, s. 104]

Life Jackets

132 [Repealed, SOR/2009-317, s. 104]

Transfer of Personnel

133 [Repealed, SOR/2009-317, s. 104]

Smoking

134 [Repealed, SOR/2009-317, s. 104]

Welding

135 [Repealed, SOR/2009-317, s. 104]

Impaired Abilities

136 [Repealed, SOR/2009-317, s. 104]

Corrosive Material

137 [Repealed, SOR/2009-317, s. 104] 138 [Repealed, SOR/2009-317, s. 104] 139 [Repealed, SOR/2009-317, s. 104]

Explosives

140 [Repealed, SOR/2009-317, s. 104]

Radioactive Substances

141 [Repealed, SOR/2009-317, s. 104] 142 [Repealed, SOR/2009-317, s. 104]

Operational Records and Reports

Safety and Well Evaluation Information

143 [Repealed, SOR/2009-317, s. 104]

Reference for Well Depths

144 [Repealed, SOR/2009-317, s. 104]

Notification of Significant Situation or Significant Event

145 [Repealed, SOR/2009-317, s. 104]

Notification to Conservation Engineer

146 [Repealed, SOR/2009-317, s. 104]

Submission of Survey Plan

147 [Repealed, SOR/2009-317, s. 104]

Tour Sheets and Barge Reports

148 [Repealed, SOR/2009-317, s. 104] 149 [Repealed, SOR/2009-317, s. 104] 150 [Repealed, SOR/2009-317, s. 104] 151 [Repealed, SOR/2009-317, s. 104]

Daily Records

152 [Repealed, SOR/2009-317, s. 104]

Routine Reports

153 [Repealed, SOR/2009-317, s. 104]

Downhole Survey Record

154 [Repealed, SOR/2009-317, s. 104]

Penetration and Gas Content Records

155 [Repealed, SOR/2009-317, s. 104]

Formation Flow Records

156 [Repealed, SOR/2009-317, s. 104]

Report of Structural Faults

157 [Repealed, SOR/2009-317, s. 104]

Well Termination Record

158 [Repealed, SOR/2009-317, s. 104]

Press Releases

159 [Repealed, SOR/2009-317, s. 104]

Well Evaluation

General

160 [Repealed, SOR/2009-317, s. 104]

Drill Cuttings

161 [Repealed, SOR/2009-317, s. 104]

Cores

162 [Repealed, SOR/2009-317, s. 104] 163 [Repealed, SOR/2009-317, s. 104]

Gas Content of Drilling Fluid

164 [Repealed, SOR/2009-317, s. 104]

Wireline Logs

165 [Repealed, SOR/2009-317, s. 104] 166 [Repealed, SOR/2009-317, s. 104] 167 [Repealed, SOR/2009-317, s. 104] 168 [Repealed, SOR/2009-317, s. 104] 169 [Repealed, SOR/2009-317, s. 104]

Testing and Sampling of Formations

170 [Repealed, SOR/2009-317, s. 104]

Formation Flow Test

171 [Repealed, SOR/2009-317, s. 104] 172 [Repealed, SOR/2009-317, s. 104] 173 [Repealed, SOR/2009-317, s. 104] 174 [Repealed, SOR/2009-317, s. 104] 175 [Repealed, SOR/2009-317, s. 104] 176 [Repealed, SOR/2009-317, s. 104]

Well or Test Hole Termination

Approval to Terminate

177 [Repealed, SOR/2009-317, s. 104]

Application for Approval

178 [Repealed, SOR/2009-317, s. 104]

Removal of Casing

179 [Repealed, SOR/2009-317, s. 104] 180 [Repealed, SOR/2009-317, s. 104]

Drilling Rig Removal Prohibited

181 [Repealed, SOR/2009-317, s. 104]

Operator Responsible for Abandoned Wells

182 [Repealed, SOR/2009-317, s. 104] 183 [Repealed, SOR/2009-317, s. 104]

Location of Abandonment Plugs

184 [Repealed, SOR/2009-317, s. 104] 185 [Repealed, SOR/2009-317, s. 104]

Length and Quality of Cement Plugs

186 [Repealed, SOR/2009-317, s. 104]

Feeling for Plugs

187 [Repealed, SOR/2009-317, s. 104]

Termination of Shallow Holes

188 [Repealed, SOR/2009-317, s. 104]

Marking of Wellheads

189 [Repealed, SOR/2009-317, s. 104]

Fluid in Completed, Abandoned or Suspended Wells

190 [Repealed, SOR/2009-317, s. 104]

Suspended Wells

191 [Repealed, SOR/2009-317, s. 104] 192 [Repealed, SOR/2009-317, s. 104]

Well Completion

193 [Repealed, SOR/2009-317, s. 104]

Deposition of Samples from a Well

General

194 [Repealed, SOR/2009-317, s. 104] 195 [Repealed, SOR/2009-317, s. 104]

Drill Cuttings

196 [Repealed, SOR/2009-317, s. 104]

Sidewall Cores

197 [Repealed, SOR/2009-317, s. 104]

Conventional Cores

198 [Repealed, SOR/2009-317, s. 104]

Analysis of Fluid Samples

199 [Repealed, SOR/2009-317, s. 104]

Delivery of Samples and Other Materials to Chief

200 [Repealed, SOR/2009-317, s. 104]

Final Well Reports

Exploratory and Development Wells

201 [Repealed, SOR/2009-317, s. 104]

Test Holes

202 [Repealed, SOR/2009-317, s. 104]

Offences

203 [Repealed, SOR/2009-317, s. 104]