Coal Mining Occupational Health and Safety Regulations, SOR/90-97

Section 71

Cite as Coal Mining Occupational Health and Safety Regulations, SOR/90-97, s. 71 · current to July 24, 2025 · regulation last amended January 1, 2021

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Where a cage or trip is at its lowest point on the run, the drum shall have remaining on it at least five turns of hoist rope. (2) The diameter of a hoist rope sheave shall be not less than (a) for a rope 25 mm or more in diameter, 80 times the rope diameter; and (b) for a rope less than 25 mm in diameter, 60 times the rope diameter. (3) Every hoist rope sheave shall be machined to fit the rope that is used on it.
Read the Coal Mining Occupational Health and Safety Regulations on the Justice Laws Website ↗

Made under Canada Labour Code, R.S.C. 1985, c. L-2.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.