Railway Interswitching Regulations, SOR/88-41
Section 7
Cite as Railway Interswitching Regulations, SOR/88-41, s. 7 · current to July 24, 2025 · regulation last amended June 25, 2019
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) The distances referred to in subsection (2), other than the distances referred to in subparagraph (2)(d)(i) and paragraph (2)(e), are measured along the track of the terminal carrier.
(2) For the purposes of these Regulations, the following interswitching distance zones are established:
(a) interswitching distance zone 1, being a zone that includes sidings located wholly or partly within 6.4 km of an interchange;
(b) interswitching distance zone 2, being a zone that includes sidings located
(i) wholly or partly within 10 km of an interchange, and
(ii) wholly outside interswitching distance zone 1;
(c) interswitching distance zone 3, being a zone that includes sidings located
(i) wholly or partly within 20 km of an interchange, and
(ii) wholly outside interswitching distance zones l and 2;
(d) interswitching distance zone 4A, being a zone that includes sidings located
(i) wholly or partly within a radius of 30 km of an interchange,
(i.1) wholly or partly within 40 km or less of an interchange, and
(ii) wholly outside interswitching distance zones 1, 2 and 3;
(e) interswitching distance zone 4B, being a zone that includes sidings that are
(i) wholly or partly within a radius of 30 km of an interchange, and
(ii) wholly outside interswitching distance zones 1, 2, 3 and 4A.
Read the Railway Interswitching Regulations on the Justice Laws Website ↗
Made under Canada Transportation Act, S.C. 1996, c. 10.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.