Oil and Gas Occupational Safety and Health Regulations, SOR/87-612
Section 4.13
Cite as Oil and Gas Occupational Safety and Health Regulations, SOR/87-612, s. 4.13 · current to February 4, 2026 · regulation last amended January 30, 2026
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Before the commencement of work on an excavation, trench or tunnel or the creation of an opening in a bulkhead, deck or similar structure, the employer shall mark the location of all pipes, cables and conduits in the area where the work is to be done.
(2) Where an excavation, trench or opening constitutes a hazard to employees, a barricade shall be installed around it.
(3) Where an employee is required to enter an excavation or trench that is more than 1.4 m deep and the sides of which are sloped at an angle of 45° or more to the horizontal, or a tunnel,
(a) the walls of the excavation, trench or tunnel, and
(b) the roof of the tunnelshall be supported by shoring and bracing that is installed as the excavation, trench or tunnel is being excavated.
(4) Subsection (3) does not apply in respect of a trench where the employer provides a system of shoring composed of steel plates and bracing, welded or bolted together, that can support the walls of the trench from the ground level to the trench bottom and can be moved along as work progresses.
(5) The installation and removal of the shoring and bracing referred to in subsection (3) shall be performed or supervised by a qualified person.
(6) Tools, machinery, timber, excavated materials or other objects shall not be placed within 1 m from the edge of an excavation, trench or opening.
Read the Oil and Gas Occupational Safety and Health Regulations on the Justice Laws Website ↗
Made under Canada Labour Code, R.S.C. 1985, c. L-2.