Gas Pipeline Uniform Accounting Regulations, SOR/83-190

Section 42

Cite as Gas Pipeline Uniform Accounting Regulations, SOR/83-190, s. 42 · current to July 24, 2025 · regulation last amended March 16, 2020

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Where a plant unit of line pipe is replaced with other pipe in the same location, a company shall debit to the appropriate plant account the cost of opening and back filling the trench together with the cost of hauling, laying and connecting the pipe, the cost of removing retired pipe from the trench and other costs of pipeline construction. (2) The cost of reconditioning line pipe not removed shall be accounted for as repairs and not as retirements or replacements. (3) Where the plant unit of line pipe referred to in subsection (1) is not replaced by new pipe in the same location, the cost of opening and back filling the trench from which the pipe is removed together with the cost of removing the pipe shall be accounted for as cost of salvage.
Read the Gas Pipeline Uniform Accounting Regulations on the Justice Laws Website ↗

Made under N-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.