Regulation of Canada
Canada Oil and Gas Drilling Regulations
Regulations Respecting the Exploration and Drilling for and the Conservation of Oil and Gas and the Measures to Ensure the Safety of such Operations
Statute Watch
Get an alert when a bill in Parliament would change this regulation, and every time it moves.
- Citation
- SOR/79-82
- Current to
- July 24, 2025
- Last amended
- December 31, 2009
- Made under
- Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7
- Official text
- Justice Laws Website ↗
Bills in Parliament that would change it 0
No bill we hold would amend or repeal it.
Contents 194 entries
Short Title
1 [Repealed, SOR/2009-315, s. 103]Interpretation
2 [Repealed, SOR/2009-315, s. 103]Application
3 [Repealed, SOR/2009-315, s. 103]Submission of Information
4 [Repealed, SOR/2009-315, s. 103]General
Application for Authorization
5 [Repealed, SOR/2009-315, s. 103]Conditions of Drilling Program Authorization
6 [Repealed, SOR/2009-315, s. 103] 7. to 12 [Repealed, SOR/96-116, s. 3]Defective or Experimental Equipment
13 [Repealed, SOR/2009-315, s. 103] 14 [Repealed, SOR/2009-315, s. 103] 15 [Repealed, SOR/96-116, s. 5]Support Craft
16 [Repealed, SOR/2009-315, s. 103] 17 [Repealed, SOR/2009-315, s. 103]Standby Craft
18 [Repealed, SOR/2009-315, s. 103] 19 [Repealed, SOR/2009-315, s. 103] 20 [Repealed, SOR/96-116, s. 7]Hazards
21 [Repealed, SOR/2009-315, s. 103]Requirements for Drilling Units
22 [Repealed, SOR/2009-315, s. 103] 23. to 29 [Repealed, SOR/96-116, s. 9]Standards For Drilling Equipment
30 [Repealed, SOR/2009-315, s. 103]Meteorological Forecasts
31 [Repealed, SOR/2009-315, s. 103] 32. to 37 [Repealed, SOR/96-116, s. 10]Electrical Equipment
38 [Repealed, SOR/2009-315, s. 103] 39 [Repealed, SOR/2009-315, s. 103] 40. to 56 [Repealed, SOR/96-116, s. 11]Small Drilling and Service Rigs
57 [Repealed, SOR/2009-315, s. 103]Diving Operations
58 [Repealed, SOR/96-116, s. 13] 59 [Repealed, SOR/2009-315, s. 103]Blowout Preventer Requirements
60 [Repealed, SOR/2009-315, s. 103] 61 [Repealed, SOR/2009-315, s. 103] 62 [Repealed, SOR/2009-315, s. 103]Casing
63 [Repealed, SOR/2009-315, s. 103] 64 [Repealed, SOR/2009-315, s. 103] 65 [Repealed, SOR/2009-315, s. 103] 66 [Repealed, SOR/2009-315, s. 103] 67 [Repealed, SOR/2009-315, s. 103] 68 [Repealed, SOR/2009-315, s. 103] 69 [Repealed, SOR/2009-315, s. 103] 70 [Repealed, SOR/2009-315, s. 103]Cementation of Casing
71 [Repealed, SOR/2009-315, s. 103] 72 [Repealed, SOR/2009-315, s. 103] 73 [Repealed, SOR/2009-315, s. 103]Marine Riser
74 [Repealed, SOR/2009-315, s. 103]Drilling Fluid System
75 [Repealed, SOR/2009-315, s. 103]Air, Foam and Gas Drilling
76 [Repealed, SOR/2009-315, s. 103]Testing Equipment
77 [Repealed, SOR/2009-315, s. 103]Manuals
78 [Repealed, SOR/2009-315, s. 103]Contingency Plans
79 [Repealed, SOR/2009-315, s. 103]Approval to Drill, Approval to Re-enter or Approval to Drill a Test Hole
Prohibition
80 [Repealed, SOR/2009-315, s. 103]Notification
81 [Repealed, SOR/2009-315, s. 103]Granting, Suspension and Revocation of Approvals
82 [Repealed, SOR/2009-315, s. 103] 83 [Repealed, SOR/2009-315, s. 103] 84 [Repealed, SOR/2009-315, s. 103]Surface Improvements
85 [Repealed, SOR/2009-315, s. 103]Location of Well
86 [Repealed, SOR/2009-315, s. 103] 87 [Repealed, SOR/2009-315, s. 103] 88 [Repealed, SOR/2009-315, s. 103]Well Prognosis
89 [Repealed, SOR/2009-315, s. 103]Evidence of Financial Responsibility
90 [Repealed, SOR/2009-315, s. 103] 91 [Repealed, SOR/96-116, s. 21]Authorized Entry, Inspection and Investigations
Conservation Officers and Safety Officers
92 [Repealed, SOR/96-116, s. 22] 93 [Repealed, SOR/2009-315, s. 103] 94 [Repealed, SOR/2009-315, s. 103] 95 [Repealed, SOR/2009-315, s. 103]Investigation of Accidents
96 [Repealed, SOR/2009-315, s. 103] 97 [Repealed, SOR/2009-315, s. 103] 98 [Repealed, SOR/2009-315, s. 103]Drilling of a Well
99 [Repealed, SOR/2009-315, s. 103] 100 [Repealed, SOR/2009-315, s. 103]Safety Zone
101 [Repealed, SOR/2009-315, s. 103]Availability of Regulations
102 [Repealed, SOR/2009-315, s. 103]Display of Authorizations, Approvals and Critical Procedures
103 [Repealed, SOR/2009-315, s. 103]Surveys
104 [Repealed, SOR/2009-315, s. 103]Well Control Equipment
105 [Repealed, SOR/2009-315, s. 103] 106 [Repealed, SOR/2009-315, s. 103] 107 [Repealed, SOR/2009-315, s. 103] 108 [Repealed, SOR/2009-315, s. 103]Safety Valves
109 [Repealed, SOR/2009-315, s. 103]Choke Manifold
110 [Repealed, SOR/2009-315, s. 103]Flow Lines from Wells
111 [Repealed, SOR/2009-315, s. 103] 111.1 [Repealed, SOR/2009-315, s. 103] 111.2 [Repealed, SOR/2009-315, s. 103]Flare Line and Flare Pit
112 [Repealed, SOR/2009-315, s. 103]Protection of Permafrost
113 [Repealed, SOR/2009-315, s. 103]Pressure Tests of Casing and Preventers
114 [Repealed, SOR/2009-315, s. 103] 115 [Repealed, SOR/2009-315, s. 103] 115.1 [Repealed, SOR/2009-315, s. 103] 116 [Repealed, SOR/2009-315, s. 103]Coal and Mineral Deposits
117 [Repealed, SOR/2009-315, s. 103]Cementation
118 [Repealed, SOR/2009-315, s. 103] 119 [Repealed, SOR/2009-315, s. 103]Waiting on Cement Time
120 [Repealed, SOR/2009-315, s. 103]Maximum Pressure During Well Stimulation
121 [Repealed, SOR/2009-315, s. 103]Formation Leak-Off Test
122 [Repealed, SOR/2009-315, s. 103]Monitoring of Drilling
123 [Repealed, SOR/2009-315, s. 103] 124 [Repealed, SOR/2009-315, s. 103]Volume of Drilling Fluid
125 [Repealed, SOR/2009-315, s. 103] 126 [Repealed, SOR/2009-315, s. 103]Pressure Transition Zone
127 [Repealed, SOR/2009-315, s. 103]Directional and Deviation Surveys
128 [Repealed, SOR/2009-315, s. 103]Plugging Back of Wells
129 [Repealed, SOR/2009-315, s. 103]Drilling Unsafe to Continue
130 [Repealed, SOR/2009-315, s. 103]Inspections and Tests of Equipment
131 [Repealed, SOR/2009-315, s. 103] 132 [Repealed, SOR/96-116, s. 28]Inspection of Electrical Equipment
133 [Repealed, SOR/2009-315, s. 103] 134 [Repealed, SOR/96-116, s. 29]Quantities of Consumables
135 [Repealed, SOR/2009-315, s. 103]Bulk Handling of Fuel and Consumables
136 [Repealed, SOR/2009-315, s. 103]Waste Material
137 [Repealed, SOR/2009-315, s. 103] 138 [Repealed, SOR/2009-315, s. 103] 139 [Repealed, SOR/2009-315, s. 103]Radio and Support Craft Procedures
140 [Repealed, SOR/2009-315, s. 103] 141 [Repealed, SOR/2009-315, s. 103] 142 [Repealed, SOR/2009-315, s. 103]Moving Drilling Units
143 [Repealed, SOR/2009-315, s. 103]Anchors
144 [Repealed, SOR/2009-315, s. 103]Stability
145 [Repealed, SOR/2009-315, s. 103] 146 [Repealed, SOR/96-116, s. 30]Safety and Training of Personnel
General
147 [Repealed, SOR/2009-315, s. 103]General Safety
148 [Repealed, SOR/2009-315, s. 103] 149 [Repealed, SOR/2009-315, s. 103]Training of Personnel
150 [Repealed, SOR/2009-315, s. 103]Safety Drills
151 [Repealed, SOR/2009-315, s. 103] 152. and 153 [Repealed, SOR/96-116, s. 31]Safety Instruction
154 [Repealed, SOR/2009-315, s. 103]Rest Period
155 [Repealed, SOR/2009-315, s. 103] 156. and 157 [Repealed, SOR/96-116, s. 32]Smoking
158 [Repealed, SOR/2009-315, s. 103] 159. to 163 [Repealed, SOR/96-116, s. 33]Radioactive Substances
164 [Repealed, SOR/2009-315, s. 103] 165 [Repealed, SOR/2009-315, s. 103] 166. to 168 [Repealed, SOR/96-116, s. 34]Operational Records and Reports
General
Safety and Well Evaluation Information
169 [Repealed, SOR/2009-315, s. 103]Reference for Well Depths
170 [Repealed, SOR/2009-315, s. 103]Notification of Significant Event
171 [Repealed, SOR/2009-315, s. 103]Notifications to Conservation Engineer
172 [Repealed, SOR/2009-315, s. 103]Submission of Survey Plan
173 [Repealed, SOR/2009-315, s. 103]Tour Sheets and Barge Reports
174 [Repealed, SOR/2009-315, s. 103] 175 [Repealed, SOR/2009-315, s. 103] 176 [Repealed, SOR/2009-315, s. 103] 177 [Repealed, SOR/2009-315, s. 103]Daily Records
178 [Repealed, SOR/2009-315, s. 103]Routine Reports
179 [Repealed, SOR/2009-315, s. 103]Downhole Survey Record
180 [Repealed, SOR/2009-315, s. 103]Penetration and Gas Content Records
181 [Repealed, SOR/2009-315, s. 103]Formation Flow Records
182 [Repealed, SOR/2009-315, s. 103]Report of Structural Faults
183 [Repealed, SOR/2009-315, s. 103]Well Termination Report
184 [Repealed, SOR/2009-315, s. 103]Press Releases
185 [Repealed, SOR/2009-315, s. 103]Well Evaluation
General
186 [Repealed, SOR/2009-315, s. 103]Drill Cuttings
187 [Repealed, SOR/2009-315, s. 103]Cores
188 [Repealed, SOR/2009-315, s. 103] 189 [Repealed, SOR/2009-315, s. 103]Gas Content of Drilling Fluid
190 [Repealed, SOR/2009-315, s. 103]Wireline Logs
191 [Repealed, SOR/2009-315, s. 103] 192 [Repealed, SOR/2002-170, s. 6] 193 [Repealed, SOR/2009-315, s. 103] 194 [Repealed, SOR/2009-315, s. 103] 195 [Repealed, SOR/2009-315, s. 103]Testing and Sampling of Formations
196 [Repealed, SOR/2009-315, s. 103]Formation Flow Test
197 [Repealed, SOR/2009-315, s. 103] 198 [Repealed, SOR/2009-315, s. 103] 199 [Repealed, SOR/2009-315, s. 103] 200 [Repealed, SOR/2009-315, s. 103] 201 [Repealed, SOR/2009-315, s. 103] 202 [Repealed, SOR/2009-315, s. 103]Well Termination
Application
203 [Repealed, SOR/2009-315, s. 103]Removal of Casing
204 [Repealed, SOR/2009-315, s. 103]Surface Marking and Restoration
205 [Repealed, SOR/2009-315, s. 103] 206 [Repealed, SOR/2009-315, s. 103]Drilling Rig Removal Prohibited
207 [Repealed, SOR/2009-315, s. 103]Operator Responsible for Abandoned Wells
208 [Repealed, SOR/2009-315, s. 103] 209 [Repealed, SOR/2009-315, s. 103]Location of Abandonment Plugs
210 [Repealed, SOR/2009-315, s. 103] 211 [Repealed, SOR/2009-315, s. 103]Length and Quality of Cement Plugs
212 [Repealed, SOR/2009-315, s. 103]Feeling for Plugs
213 [Repealed, SOR/2009-315, s. 103]Termination of Test Holes
214 [Repealed, SOR/2009-315, s. 103] 215 [Repealed, SOR/2009-315, s. 103]Marking of Well-heads
216 [Repealed, SOR/2009-315, s. 103]Fluid in Abandoned or Suspended Wells
217 [Repealed, SOR/2009-315, s. 103]Suspended Wells
218 [Repealed, SOR/2009-315, s. 103] 219 [Repealed, SOR/2009-315, s. 103]Well Completion
220 [Repealed, SOR/2009-315, s. 103]Deposition of Samples from a Well
General
221 [Repealed, SOR/2009-315, s. 103] 222 [Repealed, SOR/2009-315, s. 103]Drill Cuttings
223 [Repealed, SOR/2009-315, s. 103]Sidewall Cores
224 [Repealed, SOR/2009-315, s. 103]Conventional Cores
225 [Repealed, SOR/2009-315, s. 103]Analysis of Fluid Samples
226 [Repealed, SOR/2009-315, s. 103]Delivery of Samples and Other Materials to Chief
227 [Repealed, SOR/2009-315, s. 103]Final Well Reports
Exploratory and Development Wells
228 [Repealed, SOR/2009-315, s. 103]Test Holes
229 [Repealed, SOR/2009-315, s. 103]Offences
234 [Repealed, SOR/2009-315, s. 103] 235 [Repealed, SOR/2002-170, s. 9]