Clean Electricity Regulations, SOR/2024-263

Section 6

Electricity generation capacity

Cite as Clean Electricity Regulations, SOR/2024-263, s. 6 · current to July 24, 2025 · regulation last amended January 1, 2025

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Subject to subsection (6), a unit’s electricity generation capacity is (a) the unit’s maximum gross power, measured at the electrical terminals of the unit’s generators and determined in accordance with subsections (2) to (4); or (b) if the responsible person has not determined the unit’s maximum gross power, the unit’s most recent maximum continuous rating. (2) To determine a unit’s maximum gross power, the responsible person must conduct, in the presence of the performance test verifier referred to in subsection (3), a performance test that (a) is conducted on or after January 1, 2025; (b) is a continuous test that lasts at least two hours; (c) does not compromise the continued operation of the unit by exceeding the operating specifications for temperature, pressure or electrical conductivity recommended by the manufacturer of the equipment that is part of the unit; (d) does not require that the planned maintenance schedule of the unit be altered; and (e) has results that are adjusted to standard conditions. (3) The performance test verifier is an individual who (a) is independent of the responsible person; and (b) has demonstrated knowledge of the performance testing of units that generate electricity using fossil fuel and at least five years’ experience with respect to such testing. (4) A responsible person that conducts a performance test must submit to the Minister a performance test report prepared by the performance test verifier that contains the information set out in Schedule 1. (5) A responsible person that submits a performance test report for a unit after the registration report for the unit is submitted under subsection 7(1), paragraph 7(2)(a) or subsection 8(2) must submit to the Minister, no later than 60 days after the day on which the test is conducted, the performance test report along with the updated registration report referred to in subsection 7(4). (6) If, during a calendar year in which a unit is subject to an emission limit under subsection 9(1), the maximum gross power or maximum continuous rating of the unit changes, the unit’s electricity generation capacity for that calendar year is determined by the formulaThe sum of the products of Ci and Di divided by N for each period “i” of a calendar year.whereiis the ith period of the calendar year, where “i” goes from 1 to n and where n is the number of periods in the calendar year during which the unit’s electricity generation capacity differs from the preceding or subsequent period;Ciis the electricity generation capacity of the unit during the ith period of the calendar year;Diis the length of the ith period of the calendar year, expressed in days; andNis the number of days during the calendar year that the unit’s electricity generation capacity is greater than zero. (7) The electricity generation capacity determined under subsection (2) or (6) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.
Read the Clean Electricity Regulations on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.