The text
(1) If the conditions set out in subsection 25(1) will continue to be met for more than 30 days after the day on which the unit receives the direction to generate electricity referred to in paragraph 25(1)(d), the responsible person may, within 30 days after the day on which the direction is received, apply to the Minister for an extension of the deduction period.
(2) The application must include
(a) the registration number assigned to the unit by the Minister under subsection 7(3), if any;
(b) the date on which and hour at which the deduction period began;
(c) a description of the irresistible emergency event or risk to human health and safety that caused the electricity system operator to direct the unit to generate electricity, including
(i) the date on which and hour at which the event or risk began and, if applicable, the date on which and hour at which it ended,
(ii) the province or state in which the event or risk occurred,
(iii) the province or state in which the disruption or significant risk of disruption to the electricity supply occurred, and
(iv) information demonstrating that the unit received the direction to generate electricity to alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply; and
(d) if the direction to generate electricity is due to the electricity system operator determining that there is an irresistible emergency event, information, along with supporting documents, demonstrating that
(i) the electricity system operator determined that an irresistible emergency event occurred,
(ii) the event was outside the control of the electricity system operator and the responsible person for the unit,
(iii) the irresistible emergency event caused the disruption or significant risk of disruption to the electricity supply that the direction to generate electricity is intended to alleviate or materially help alleviate, and
(iv) the disruption or significant risk of disruption to the electricity supply arising from the event will continue for more than 30 days after the day on which the deduction period began.
(3) If the Minister is satisfied that the conditions set out in subsection 25(1) will continue to be met, the Minister must, within 10 days after the day on which the application is received, grant an extension of the deduction period.
(4) Before granting an extension of a deduction period based on an irresistible emergency event, the Minister must be satisfied that
(a) the event occurred;
(b) the event is outside the control of the electricity system operator and the responsible person for the unit;
(c) the disruption or significant risk of disruption to the electricity supply arising from the event will continue; and
(d) the generation of electricity by the unit will alleviate or materially help alleviate the disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state.
Read the Clean Electricity Regulations on the Justice Laws Website ↗
Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.