Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26

Section 199

Well records and reports

Cite as Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26, s. 199 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) An operator must ensure that (a) a well termination record is submitted to the Board in respect of a well within 21 days after (i) the day on which the well is abandoned, (ii) the day on which the well is suspended if the suspension is planned to be for a period that is longer than 21 days, or (iii) the day on which the well is completed or recompleted; (b) a well operation report is submitted to the Board in respect of a well that requires a workover or intervention within 30 days after the day on which the workover or intervention is completed; (c) a well history report is submitted to the Board in respect of a development well within 45 days after the day referred to in subparagraph (a)(i), (ii) or (iii), as the case may be; (d) a well history report is submitted to the Board in respect of an exploration or delineation well within 90 days after the day referred to in subparagraph (a)(i), (ii) or (iii), as the case may be; and (e) the actual cost breakdown of all well operations is submitted to the Board within 90 days after the day on which a well is abandoned, suspended or completed. (2) The record required under paragraph (1)(a) must describe the manner in which the well has been abandoned, suspended, completed or recompleted and must include a schematic of the well illustrating the nature and location of the plugs used to abandon or suspend the well or the equipment used to complete or recomplete the well. (3) The reports required under paragraphs (1)(b) to (d) must contain a record of all operational, engineering, petrophysical, geophysical and geological information that is relevant to the well operation, including any problems encountered during the well operation and the results of any formation leak-off test or formation integrity test conducted under section 70. (4) The report required under paragraph (1)(b) must describe any impact of the workover or intervention on the performance of the well, including any effect on productivity, injectivity and the recovery of petroleum.
Read the Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1988, c. 28.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.