Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26

Section 144

Ballast and bilge systems

Cite as Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26, s. 144 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) An operator must ensure that a floating platform is equipped with reliable ballast and bilge systems with the necessary redundancy in their components to (a) maintain necessary draught, stability and hull strength under all foreseeable operating conditions; (b) return the floating platform to a safe condition from an unintended draught, trim or heel; (c) prevent unintended transfer of fluid within the system; (d) empty and fill all tanks that are a part of the system; and (e) completely and rapidly empty watertight spaces. (2) The operator must comply with the applicable provisions of the MODU Code concerning ballast and bilge systems, which are to be read as mandatory. (3) In the case of a column-stabilized mobile offshore platform, the operator must ensure that it is equipped with a secondary ballast control station that is equipped with (a) an effective means of communication with other spaces that contain equipment relating to the operation of the ballast system; (b) a ballast pump control and status system; (c) a ballast valve control and status system; (d) a tank level indicating system; (e) a permanently mounted ballast schematic diagram; (f) heel and trim indicators; (g) a draught-indicating system; (h) a system to indicate the available power from the main and emergency electrical power supplies; and (i) a ballast system hydraulic or pneumatic pressure-indicating system. (4) The operator must ensure that a secondary ballast control station is located above the waterline in the final condition of equilibrium after flooding if the floating platform is in a damaged condition. (5) The operator must ensure that the ballast and bilge systems are assessed through a failure modes and effects analysis before any authorized work or activity is carried out from the floating platform.
Read the Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1988, c. 28.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.