Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26

Section 123

Control system

Cite as Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26, s. 123 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) An operator must ensure that a control system is designed in accordance with the measures referred to in clauses 9(2)(b)(v)(D) and 10(2)(b)(v)(D) that are described in the operator’s safety plan and environmental protection plan, respectively. (2) The operator must ensure that the control system is designed to meet the following requirements, taking into account human factors: (a) controlled equipment must not be capable of being inadvertently activated; (b) controlled equipment must not create a safety or environmental hazard in the event of system failure or shutdown; (c) the system must have basic diagnostic capability; and (d) the system must be capable of being operated simultaneously from multiple control stations without compromising safety. (3) The operator must ensure that control system hardware is protected from circumstances, including excessive vibration, high electromagnetic field levels, electrical power disturbances and extreme temperatures or humidity levels or other physical and environmental conditions, that could cause mechanical damage to or degradation of the hardware or that could otherwise adversely affect the performance of the system. (4) The operator must ensure that any wireless remote control system includes (a) a means for error checking to prevent the controlled equipment from responding to corrupt data; and (b) a means for identification coding to prevent a transmitter other than the designated transmitter from operating the equipment. (5) The operator must ensure that all control system functions that are required to ensure safety and are dependent on wireless communication links have an alternative means of control that can be activated without delay and without modification to the control system. (6) Equipment that is to be operated by a new, repaired or modified control system must not be put into operation until the operator ensures that the control system has been inspected and tested to confirm that it functions as intended. (7) The operator must ensure that documentation containing an up-to-date description of the design, installation, operation and maintenance of the control systems is readily accessible for consultation and examination.
Read the Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1988, c. 28.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.