Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations, SOR/2024-25

Section 76

Allocation over multiple pools or zones

Cite as Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations, SOR/2024-25, s. 76 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) If a well is completed over multiple pools or zones, the operator must ensure that the production of oil, gas and water from the well and the volume of fluids injected into the well are allocated on a pro rata basis to the pools or zones using the flow allocation procedure approved under subsection 14(2). (2) The operator must ensure that sufficient proration tests are conducted to measure the rates at which fluids are produced from the well to ensure that the allocation of oil, gas and water production to the pools and zones as a result of the flow allocation procedure is accurate.
Read the Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Newfoundland and Labrador Atlantic Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1987, c. 3.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.