Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations, SOR/2024-25

Section 14

Flow system, calculation and allocation

Cite as Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations, SOR/2024-25, s. 14 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) If the application for an authorization is in respect of a production project, the operator must submit to the Board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in sections 74 to 78, as well as any alternate measurements referred to in subsection 74(2) that the operator proposes to conduct. (2) The Board must approve the flow system, the flow calculation procedure and the flow allocation procedure if the applicant demonstrates that the system and procedures facilitate accurate measurements and the allocation, on a pool or zone basis, of the production from and injection into individual wells.
Read the Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Newfoundland and Labrador Atlantic Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1987, c. 3.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.