Clean Fuel Regulations, SOR/2022-140

Section 86

End of validity

Cite as Clean Fuel Regulations, SOR/2022-140, s. 86 · current to July 24, 2025 · regulation last amended September 30, 2024

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The approved carbon intensity of a low-carbon-intensity fuel or material input ceases to be valid if a change is made to the extraction or production processes for the feedstock used to produce the fuel or material input or the production processes and that change is not consistent with the emission factors, input data, background data sets and methodology that were used to determine the carbon intensity and would result in, (a) in the case where the carbon intensity was determined in accordance with paragraph 75(1)(b), production processes that are different than those used to determine the approved carbon intensity of the fuel or material input; (b) in the case where the carbon intensity was determined in accordance with section 76, an actual carbon intensity of the fuel or material input — as specified in the carbon-intensity-pathway report referred to in subsection 123(1) — that is greater than the approved carbon intensity by at least (i) 1 gCO2e/MJ, if the absolute value of the approved carbon intensity is less than 20 gCO2e/MJ, (ii) 5%, if the absolute value of the approved carbon intensity is between 20 and 100 gCO2e/MJ, and (iii) 5 gCO2e/MJ, if the absolute value of the approved carbon intensity is greater than 100 gCO2e/MJ; and (c) in the case where the carbon intensity was approved for a CO2e-emission-reduction project described in paragraph 30(d), fuel production processes or conditions that are different than those indicated in the application made under subsection 80(1) for the approval of the carbon intensity. (2) The approved carbon intensity of a fuel or material input ceases to be valid if the registered creator, carbon-intensity contributor or foreign supplier who made the application for approval under subsection 80(1) fails to comply with the requirements set out in section 123. (3) The approved carbon intensity of a gaseous or liquid low-carbon-intensity fuel that was produced using a quantity of an eligible feedstock referred to in paragraph 46(1)(b) or (c) ceases to be valid if the registered creator or foreign supplier who made the application for approval under subsection 80(1) fails to comply with the requirements set out in section 124. (4) The approved carbon intensity of a co-processed low-carbon-intensity fuel ceases to be valid if a registered creator or foreign supplier referred to in subsection 80(1) fails to comply with the applicable specific emission-reduction quantification method established under subsection 32(1). (5) The approved carbon intensity of a low-carbon-intensity fuel or material input may be invalidated by the Minister if the registered creator, carbon-intensity contributor or foreign supplier who made the application for approval under subsection 80(1) fails to comply with any of the requirements set out in sections 166 and 168 in relation to the approved carbon intensity. (6) The approved carbon intensity of propane, liquefied natural gas or compressed natural gas determined in accordance with section 78 ceases to be valid if a change is made to the compression or liquefaction process for the fuel and that change is not consistent with the emission factors, input data, background data sets and methodology that were used to determine the carbon intensity and would result in an actual carbon intensity of the fuel — as specified in the carbon-intensity-pathway report referred to in subsection 123(1) — that is greater than the approved carbon intensity by at least (a) 1 gCO2e/MJ, if the absolute value of the approved carbon intensity is less than 20 gCO2e/MJ; (b) 5%, if the absolute value of the approved carbon intensity is between 20 and 100 gCO2e/MJ; and (c) 5 gCO2e/MJ, if the absolute value of the approved carbon intensity is greater than 100 gCO2e/MJ. (7) The approved carbon intensity of electricity determined in accordance with section 79 ceases to be valid if a change is made to the source and quantity of electricity supplied to electric vehicles or facilities and that change would result in an actual carbon intensity of the electricity — as specified in the carbon-intensity-pathway report referred to in subsection 123(1) — that is greater than the approved carbon intensity by at least (a) 1 gCO2e/MJ, if the absolute value of the approved carbon intensity is less than 20 gCO2e/MJ; (b) 5%, if the absolute value of the approved carbon intensity is between 20 and 100 gCO2e/MJ; and (c) 5 gCO2e/MJ, if the absolute value of the approved carbon intensity is greater than 100 gCO2e/MJ. (8) The approved carbon intensity of a fuel or material input ceases to be valid if the registered creator, carbon-intensity contributor or foreign supplier who made the application for the approval of that carbon intensity under subsection 80(1) has determined it by using a carbon intensity that ceases to be valid under any of subsections (1) to (7). (9) A carbon intensity determined in accordance with any of sections 76 to 79 that was approved by the Minister before July 1, 2024 ceases to be valid on December 31, 2025. The registered creator, carbon-intensity contributor or foreign supplier may, on or after July 1, 2024, submit a new application to the Minister for the approval of the carbon intensity under subsection 80(1).
Read the Clean Fuel Regulations on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.