The text

(1) With respect to a project that is not in an aggregation, the proponent of a project must ensure that the project site is visited by a verification body in the following situations: (a) it is the initial verification of the project for the purposes of these Regulations or it is the initial verification by the verification body; (b) if the quantity of GHG reductions referred to in subsection 20(1) or (2) that is reported in the project report being verified is less than 10,000 tonnes of CO2e for any calendar year covered by the report, it has been at least 24 months since the project site was visited by a verification body; (c) if the quantity of GHG reductions referred to in subsection 20(1) or (2) that is reported in the project report being verified is equal to or greater than 10,000 tonnes of CO2e for any calendar year covered by the report, it has been at least 12 months since the project site was visited by a verification body; (d) in accordance with ISO Standard 14064-3, issued a modified or adverse opinion with respect to the quantity of GHG reductions reported in the previous project report; (e) the verification body is conducting a verification of a reversal report; or (f) the verification body is of the opinion that a site visit is required. (2) With respect to a project in an aggregation, the proponent of an aggregation of projects must ensure that the site of a project in the aggregation is visited by a verification body for the purposes of verifying a project report in any of the following situations: (a) the quantity of GHG reductions referred to in subsection 20(3) that is reported in the project report being verified is equal to or greater than 10,000 tonnes of CO2e for any calendar year covered by the report and it has been at least 12 months since the project site was visited by a verification body; (b) the final project report for the aggregation following the end of the crediting period is being submitted, and the project site has not been visited by a verification body during the crediting period; (c) the verification body, in accordance with ISO Standard 14064-3, issued a modified or adverse opinion with respect to the quantity of GHG reductions reported in the previous project report; (d) the verification body is conducting a verification of a reversal report; and (e) the verification body is of the opinion that a site visit is required. (3) The proponent must ensure that the site of a sequestration project for which the tonne-tonne quantification method is used is visited by a verification body as part of the verification of any monitoring report submitted after the end of the last crediting period. (4) If buildings that are used for legal, administrative or management purposes are not located where project activities are carried out and data or information necessary for verifying a report submitted under these Regulations is kept in those buildings, the proponent must ensure that the verification body visits those buildings.
Read the Canadian Greenhouse Gas Offset Credit System Regulations on the Justice Laws Website ↗

Made under Greenhouse Gas Pollution Pricing Act, S.C. 2018, c. 12, s. 186; Environmental Violations Administrative Monetary Penalties Act, S.C. 2009, c. 14, s. 126.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.