Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations, SOR/2021-25

Section 80

Part A

Cite as Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations, SOR/2021-25, s. 80 · current to September 3, 2026 · regulation last amended August 7, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Before a shipment that contains hazardous waste or hazardous recyclable material is shipped by a consignor, the consignor must ensure that Part A of the movement document is completed as follows: (a) the hazardous waste or hazardous recyclable material must be categorized into separate types by reference to all of the information set out in subparagraphs 1(g)(i) and (ii) of Schedule 4; (b) each type of hazardous waste or hazardous recyclable material for which all of that information is the same must be recorded as a line entry; (c) the information set out in paragraph 1(g) of Schedule 4 must be included in each line entry; (d) the remaining information set out in item 1 of Schedule 4 and a certification that the information provided is accurate and complete must be included; and (e) the individual who provides the information and certification must date and sign Part A. (2) Within three working days after the day on which the shipment is shipped, the consignor must ensure that Part A of the movement document is provided, in the form and manner specified by the Minister, to the authorities of the provinces from which the shipment is shipped and to which it is or is to be delivered, if those authorities ask for it. (3) Each authorized carrier must (a) complete Part B of the movement document — with Part A completed in accordance with subsection (1) — by including the information set out in item 2 of Schedule 4 and a certification that the information provided is accurate and complete; and (b) ensure that the individual who provides the information and certification dates and signs Part B. (4) Within three working days after the day on which the shipment is delivered to the site, the consignee must ensure that (a) Part C of the movement document — with Part A completed in accordance with subsection (1) — is completed by including the information set out in item 3 of Schedule 4 and a certification that the information provided is accurate and complete; (b) the individual who provides the information and certification dates and signs Part C; and (c) Part B of the movement document completed by each authorized carrier and Part C of the movement document are provided to the consignor. (5) The consignee must ensure that Part B completed by each authorized carrier and Part C of the movement document are provided to the authorities of the provinces from which the shipment is shipped and to which it is delivered, if those authorities ask for it. (6) For the purposes of subsection (4), delivery of a shipment to the site occurs when the shipment arrives at the site, regardless of when hazardous waste or hazardous recyclable material that is contained in the shipment is accepted by the consignee.
Read the Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33; Canada Shipping Act, 2001, S.C. 2001, c. 26; Impact Assessment Act, S.C. 2019, c. 28, s. 1; Environmental Violations Administrative Monetary Penalties Act, S.C. 2009, c. 14, s. 126.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.