Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations, SOR/2021-25

Section 40

Part A

Cite as Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations, SOR/2021-25, s. 40 · current to September 3, 2026 · regulation last amended August 7, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Before a shipment that contains hazardous waste or hazardous recyclable material is shipped from a facility under one or more permits, Part A of the movement document must be completed as follows: (a) each type of hazardous waste or hazardous recyclable material that is contained in the shipment and that was recorded as a line entry in the notification under subsection 32(3) must be recorded as a line entry; (b) each line entry must include the reference number of the notification, the line entry number and the information that was included in the line entry in the notification under subsection 32(4), with the exception of the information referred to in clauses 3(i)(iii)(A), (F) and (L) of Schedule 3; (c) the remaining information set out in subitem 1(3) of Schedule 10 and a certification that the information provided is accurate and complete must be included; and (d) the individual who provides the information and certification must date and sign Part A. (2) Within three working days after the day on which the shipment is shipped from the facility, Part A of the movement document must be provided, in the form and manner specified by the Minister to the Minister and to the authorities of the provinces where the facility and the receiving facility are located, if those authorities ask for it. (3) Each authorized carrier that transports the shipment must complete Part B of the movement document — with Part A completed in accordance with subsection (1) — by including the information set out in item 2 of Schedule 10 and a certification that the information provided is accurate and complete. The individual who provides the information and certification must date and sign Part B. (4) Immediately after the shipment is delivered to the receiving facility, Part C of the movement document — with Part A completed in accordance with subsection (1) — must be completed as follows: (a) the information set out in subitem 3(1) of Schedule 10 and a certification that the information provided is accurate and complete must be included; and (b) the individual who provides the information and certification must date and sign Part C. (5) Within three working days after the day on which the shipment is delivered to the receiving facility, Part B of the movement document completed by each authorized carrier and Part C of the movement document must be provided, in the form and manner specified by the Minister, to the Minister and to the authorities of the provinces where the facility from which the shipment was shipped and the receiving facility are located, if those authorities ask for it. (6) For the purposes of subsections (4) and (5), delivery of a shipment to a receiving facility occurs when the shipment arrives at the receiving facility, regardless of whether or when hazardous waste or hazardous recyclable material that is contained in the shipment is accepted by the receiving facility.
Read the Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33; Canada Shipping Act, 2001, S.C. 2001, c. 26; Impact Assessment Act, S.C. 2019, c. 28, s. 1; Environmental Violations Administrative Monetary Penalties Act, S.C. 2009, c. 14, s. 126.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.