The text

(1) Subsections (2) and (3) apply to the following minor works: (a) erosion-protection works referred to in subsection 12(1); (b) aerial cables referred to in subsection 16(1); (c) submarine cables referred to in section 17; (d) buried pipelines referred to in section 19; (e) outfalls and water intakes referred to in section 26; (f) dredging referred to in section 28; and (g) watercourse crossings referred to in section 34. (2) Before beginning the construction, placement, alteration, rebuilding, removal or decommissioning of a minor work, the owner must deposit information in the registry established under section 27.2 of the Act describing the proposed activity and the minor work’s location. (3) Before beginning the construction, placement, alteration, rebuilding, removal or decommissioning of a minor work, the owner must publish a notice in accordance with the requirements set out on the Internet site maintained by the Government of Canada entitled Navigation Protection Program External Submission Site under the heading “Create a Notification of a Minor Work”, as amended from time to time, unless the proposed minor work has gone through a federal or provincial review process.
Read the Minor Works Order on the Justice Laws Website ↗

Made under Canadian Navigable Waters Act, R.S.C. 1985, c. N-22.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.