International and Interprovincial Power Line Damage Prevention Regulations — Authorizations, SOR/2019-347

Section 10

Construction of international or interprovincial power line

Cite as International and Interprovincial Power Line Damage Prevention Regulations — Authorizations, SOR/2019-347, s. 10 · current to July 24, 2025 · regulation last amended March 16, 2020

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

For the purposes of paragraph 272(1)(c) of the Act, a person may construct an international or interprovincial power line that passes on, over, along or under a facility in the following circumstances: (a) in respect of overhead crossings, the line is designed and constructed in accordance with CSA Group standard C22.3 No. 1, Overhead systems, as amended from time to time; (b) in respect of underground crossings, the line is designed and constructed in accordance with CSA Group standard C22.3 No. 7, Underground systems, as amended from time to time; (c) the line does not extend beyond any terminal of that line; (d) the line is designed and constructed in accordance with any applicable provincial and federal legislation; (e) the person obtains written permission from the owner of the facility; and (f) the person and the owner of the facility agreed in writing to a construction procedure and schedule for the work.
Read the International and Interprovincial Power Line Damage Prevention Regulations — Authorizations on the Justice Laws Website ↗

Made under Canadian Energy Regulator Act, S.C. 2019, c. 28, s. 10.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.