Output-Based Pricing System Regulations, SOR/2019-266

Section 41.1

New electricity production facility — gaseous fuel

Cite as Output-Based Pricing System Regulations, SOR/2019-266, s. 41.1 · current to July 24, 2025 · regulation last amended April 1, 2025

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) If an electricity generation facility begins generating electricity on or after January 1, 2021 and meets the following criteria, the person responsible for the covered facility must determine the GHG emissions limit that applies to the facility for each compliance period as of the compliance period during which the electricity generation began, in accordance with subsection (2): (a) at least one unit within the facility generates electricity from gaseous fuels; and (b) at least one of the units that generates electricity from gaseous fuels within the facility has an electricity generation capacity equal to or greater than 50 MW and is designed to operate at a thermal energy to electricity ratio of less than 0.9. (2) The GHG emissions limit that applies to the electricity generation facility, expressed in CO2e tonnes, is determined for each compliance period in accordance with the formulaThe summation of the products of Aj and Bj for each industrial activity referred to in paragraphs 38(a) to (c) of Schedule 1 “j”, summed for each unit “i” within the facility, plus the summation of the products of C and D, summed for each unit “k” within the facility, plus the summation of the products of E and F, summed for each unit “l” within the facilitywhereAjis, for each unit “i” within the electricity generation facility that generates electricity from solid fuel or liquid fuel, the gross amount of electricity generated during the compliance period, quantified in accordance with section 32, from the specified industrial activities set out in paragraph 38(a) and (b), column 1, of Schedule 1 that are engaged in at the unit;Bjthe output-based standard applicable to each specified industrial activity set out in paragraphs 38(a) and (b), column 1, of Schedule 1 that the are engaged in at each unit “i” and that is set out in column 3;Cis, for each unit “k” within the electricity generation facility that generates electricity from gaseous fuels, that has an electricity generation capacity equal to or greater than 50 MW and that is designed to operate at a thermal energy to electricity ratio of less than 0.9, the gross amount of electricity generated during the compliance period from the specified industrial activity set out in paragraph 38(c), column 1, of Schedule 1 that is engaged in at the unit quantified in accordance with section 32;Dis the output-based standard applicable and is(a) 370 CO2e tonnes per unit of measurement, for compliance period 2021,(b) 329 CO2e tonnes per unit of measurement, for compliance period 2022,(c) 288 CO2e tonnes per unit of measurement, for compliance period 2023,(d) 247 CO2e tonnes per unit of measurement, for compliance period 2024,(e) 206 CO2e tonnes per unit of measurement, for compliance period 2025,(f) 164 CO2e tonnes per unit of measurement, for compliance period 2026,(g) 123 CO2e tonnes per unit of measurement, for compliance period 2027,(h) 82 CO2e tonnes per unit of measurement, for compliance period 2028,(i) 41 CO2e tonnes per unit of measurement, for compliance period 2029, and(j) 0 CO2e tonnes per unit of measurement, for compliance period 2030 and subsequent compliance periods; andEis, for each unit “l” within the electricity generation facility generating electricity from gaseous fuels, that has an electricity generation capacity of less than 50 MW or is designed to operate at a thermal energy to electricity ratio of 0.9 or greater, the gross amount of electricity generated during the compliance period from the specified industrial activity set out in paragraph 38(c), column 1, of Schedule 1, that is engaged in at the unit quantified in accordance with section 32;Fthe output-based standard applicable to each specified industrial activity set out in paragraph 38(c), column 1, of Schedule 1 that are engaged in at each unit “i” and that is set out in column 3;iis the ith unit, where “i” goes from 1 to n and where n is the total number of units within the electricity generation facility generating electricity using solid fuel or liquid fuel;jis the jth activity, where “j” goes from 1 to m and where m is the total number of industrial activities set out in paragraphs 38(a) to (b), column 1, of Schedule 1 that is engaged in at the electricity generation facility;kis the kth unit, where “k” goes from 1 to r and where r is the total number of units within the electricity generation facility, generating electricity using gaseous fuel, that have an electricity generation capacity equal to or greater than 50 MW and are designed to operate at a thermal energy to electricity ratio of less than 0.9;lis the lth unit, where “l” goes from 1 to s and where s is the total number of units within the electricity generation facility, generating electricity using gaseous fuel, that have an electricity generation capacity of less than 50 MW or are designed to operate at a thermal energy to electricity ratio of 0.9 or greater.
Read the Output-Based Pricing System Regulations on the Justice Laws Website ↗

Made under Greenhouse Gas Pollution Pricing Act, S.C. 2018, c. 12, s. 186; Environmental Violations Administrative Monetary Penalties Act, S.C. 2009, c. 14, s. 126.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.