Output-Based Pricing System Regulations, SOR/2019-266
Section 20
Total emissions per unit — electricity
Cite as Output-Based Pricing System Regulations, SOR/2019-266, s. 20 · current to July 24, 2025 · regulation last amended April 1, 2025
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Subject to subsection (6), with respect to an electricity generation facility, the total quantity of GHGs from each unit within a facility, during a compliance period, expressed in CO2e tonnes, is determined by the formulaThe summation of the products of Ej and GWPj for each greenhouse gas type “j”, summed for all specified emissions types “i”whereEjis the quantity of each GHG type “j” from the unit during a compliance period for each specified emission type determined in accordance with subsections (2) to (5);GWPjis the global warming potential of the GHG type “j” applicable to the compliance period;iis the ith specified emission type, where “i” goes from 1 to n and where n is the unit’s number of specified emission types;jis the jth GHG type, where “j” goes from 1 to m and where m is the number of greenhouse gases.
(2) The quantity of a GHG type “j” generated by a unit during a compliance period for a specified emission type “i” is the sum of the following quantities, determined in accordance with the applicable requirements set out in Quantification Methods:
(a) the quantities of the GHG that is set out in column 2 of the table to Part 38 of Schedule 3 for a specified emission type set out in column 1; and
(b) any quantity of the GHG that is not referred to in paragraph (a).
(3) For the purposes of paragraph (2)(b) or (c), if the GHGs for a specified emission type referred to in subsection (2) can only be quantified for the facility as a whole, the quantity of those GHGs must be apportioned to the facility’s units on the basis of each unit’s total generation of electricity relative to the facility’s total generation of electricity.
(4) If the quantity of a GHG is determined in accordance with subsection (2), the sampling, analysis and measurement requirements that apply are those set out in Quantification Methods.
(5) For the purposes of subsection (2), if, for any reason beyond the control of the person responsible for a covered facility, the data required to quantify GHGs generated by a unit are missing for a given period of a compliance period, replacement data for the given period must be calculated in accordance with Quantification Methods.
(6) For the purposes of the determination made under subsection (1), the quantity of CH4 and N2O generated from stationary devices that combust biomass for the purpose of producing useful heat are subtracted from the quantity of CH4 and N2O calculated in accordance with subsections (2) to (5) for stationary fuel combustion emissions.
Read the Output-Based Pricing System Regulations on the Justice Laws Website ↗
Made under Greenhouse Gas Pollution Pricing Act, S.C. 2018, c. 12, s. 186; Environmental Violations Administrative Monetary Penalties Act, S.C. 2009, c. 14, s. 126.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.