Indian Oil and Gas Regulations, SOR/2019-196
Section 33
Exploration report
Cite as Indian Oil and Gas Regulations, SOR/2019-196, s. 33 · current to February 18, 2026 · regulation last amended August 1, 2019
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) An exploration licence holder must submit an exploration report to the Minister within 90 days after the day on which the exploration work is completed.
(2) The report must comply with any exploration reporting requirements of the relevant province and must include, in addition to the documents and information referred to in paragraph 32(2)(f),
(a) a copy of every aerial photograph taken during the period of exploration;
(b) two copies of a geological report on the explored area, including stratigraphic data and structural and isopach maps on a scale of not less than 1:50 000; and
(c) a geophysical report on the explored area.
(3) The geophysical report must include
(a) if seismic work has been carried out,
(i) a mylar sepia copy and two legible paper copies of a map, on a scale of not less than 1:50 000, that shows contour lines drawn on the corrected time value at each source point for all significant reflecting horizons explored, with a contour line interval of not more than 10 m,
(ii) a mylar sepia copy and two prefolded paper copies of each stacked seismic cross-section, including migrated displays if that process has been carried out, with all significant reflecting horizons clearly labelled at both ends on one of the copies, and
(iii) two microfilm copies of all basic recorded data, including survey notes, chaining notes and observer reports;
(b) if a gravity survey has been carried out, two legible copies of a map, on a scale of not less than 1:50 000, that shows the location and ground elevation of each station, the final corrected gravity value at each station and gravity contour lines drawn on that value, with a contour line interval of not more than 2.5 µm/s2; and
(c) if a magnetic survey has been carried out, two legible copies of a map of the explored area, on a scale of not less than 1:50 000, that shows the location of the flight lines or grid stations and magnetic contour lines, with a contour line interval of not more than 5 nT.
(4) The holder may include maps at contour line intervals or scales other than those specified in subsections (2) and (3) if the alternative intervals or scales would enhance the interpretability of the maps.
(5) The Minister must make the information submitted under subsections (2) to (4) available to the council.
(6) In addition to the information submitted under this section, the holder must keep any information that was obtained as a result of the exploration work carried out in the contract area, including any printout, or magnetic digital display, of raw seismic data or interpreted seismic data, and must make it available for review by the Minister at the holder’s office during business hours after the later of
(a) if the holder also holds a subsurface lease or permit in lands in the licence area, 90 days after the day on which the lease expires or is continued, the initial term of the permit expires or, in the case of a permit issued under the Indian Oil and Gas Regulations, 1995, the permit is converted to one or more leases, and
(b) one year after the day on which the exploration work is completed.
Read the Indian Oil and Gas Regulations on the Justice Laws Website ↗
Made under Indian Oil and Gas Act, R.S.C. 1985, c. I-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.