Indian Oil and Gas Regulations, SOR/2019-196

Section 21

Well data

Cite as Indian Oil and Gas Regulations, SOR/2019-196, s. 21 · current to February 18, 2026 · regulation last amended August 1, 2019

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

An operator that carries out operations in connection with a well must submit the following documents and information to the Minister and the council within the following time limits: (a) before the day on which the well is spudded, (i) a copy of the provincial licence authorizing the drilling of the well and a copy of the licence application, (ii) the drilling and coring plan proposed for the well, (iii) the geological prognosis, (iv) any proposed horizontal drilling plan, and (v) a copy of the surface lease survey plan; (b) within 30 days after the day on which the well is rig-released, (i) all daily drilling reports for the period beginning on the day on which the rig move begins and ending on the day of rig-release, (ii) a copy of each wireline log prepared, (iii) the results of any drill-stem test conducted, (iv) a copy of the final downhole well drilling survey, if one is required by the provincial authority, (v) any description, test or analysis resulting from an identification of any well sections that were cored, and (vi) a copy of the geological report, if one is required by the provincial authority; (c) within 30 days after the day on which the well is completed, (i) all daily completion reports and the final downhole well schematic, (ii) a copy of each wireline log prepared, (iii) any core and fluid analyses prepared, (iv) any swab reports prepared, (v) the results of any pressure or flow tests conducted, including the results of any surface casing vent flow test, (vi) a hydraulic fracturing fluid component information disclosure report, and (vii) a detailed report of any downhole well intervention or stimulation; (d) within 30 days after the day on which any recompletion or workover of the well is completed, (i) all daily recompletion or workover reports, (ii) a copy of each wireline log prepared, (iii) any core and fluid analyses prepared, (iv) any swab reports prepared, (v) the results of any pressure or flow tests conducted, including the results of any surface casing vent flow test, (vi) a hydraulic fracturing fluid component information disclosure report, (vii) a detailed report of any downhole well intervention or stimulation, and (viii) the final downhole well schematic; (e) within 30 days after the day on which the well is downhole-abandoned, all daily operation reports relating to the downhole abandonment; and (f) within 30 days after the day on which the well is surface-abandoned, all daily operations reports of the cut and cap operation and a copy of the final abandonment report submitted to the provincial authority.
Read the Indian Oil and Gas Regulations on the Justice Laws Website ↗

Made under Indian Oil and Gas Act, R.S.C. 1985, c. I-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.