Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector), SOR/2018-66

Section 16

Flow meters

Cite as Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector), SOR/2018-66, s. 16 · current to December 29, 2025 · regulation last amended December 12, 2025

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The flow meter must be calibrated in accordance with the manufacturer’s recommendations such that its measurements have a maximum margin of error of ±10%. (2) Those measurements must be made (a) in accordance with the recommendations set out in the manufacturer’s manual, if any; (b) in the case of a measurement made without the use of negative pressure or a vacuum, while there is a tight seal over the vent; (c) in the case of a measurement on a centrifugal compressor, when the compressor is operating under conditions that are representative of the conditions during the previous seven days; and (d) in the case of a measurement on a reciprocating compressor, when the compressor is pressurized. (3) The flow rate must be measured within the following periods: (a) initially, the period that ends on (i) January 1, 2021, if the compressor is installed at the facility before January 1, 2020, and (ii) the 365th day after the day on which the compressor was installed at the facility, in any other case; and (b) subsequently, the period that ends on the 365th day after the day on which a previous measurement was taken. (4) The initial and each subsequent measurement of the flow rate must be based on measurements made by the flow meter over a continuous period of at least five minutes and is (a) the maximum of the flow rates measured, if the measurements are made over a continuous period of at least five minutes and less than 15 minutes; or (b) the average of the flow rates measured, if the measurements are made over a continuous period of at least 15 minutes. (5) Despite subsection (3), if no measurement has been made by the last day of a period referred to in that subsection — but, on that day, the compressor is not operating, in the case of a centrifugal compressor, or the compressor is not pressurized, in the case of a reciprocating compressor — the measurement must be made under that subsection on or before the 30th day after the day on which the compressor is next operating or pressurized, as the case may be. (6) Despite subsection (3), a period referred to in that subsection is extended by 365 days if the operator for the facility makes a record that demonstrates that, during the three calendar years immediately before the end of the period, the compressor was pressurized for less than 1,314 hours, as determined by an hour meter or as recorded in a log of operations.
Read the Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector) on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.