Grade Crossings Regulations, SOR/2014-275

Section 96

Interconnection with a warning system

Cite as Grade Crossings Regulations, SOR/2014-275, s. 96 · current to July 24, 2025 · regulation last amended November 26, 2021

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Before a traffic control device that is interconnected with a warning system is placed in service, a road authority must inspect and test the traffic control device to ensure that the standards set out in articles 18 and 19 of the Grade Crossings Standards are met. (2) The inspection and testing of the elements set out in column 2 of Table 20-1 of the Grade Crossings Standards must be conducted at the frequency — as defined in Table 17-1 of those Standards — set out in column 3 of Table 20-1. (3) When the road authority inspects, tests or maintains the traffic control device, the road authority must have, at the site, information respecting the parameters for the operation of the device.
Read the Grade Crossings Regulations on the Justice Laws Website ↗

Made under Railway Safety Act, R.S.C. 1985, c. 32 (4th Supp.).

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.