Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315

Section 70

Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 70 · current to January 19, 2026 · regulation last amended December 31, 2009

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The operator of a manned installation shall ensure that at least one support craft is (a) available at a distance that is not greater than that required for a return time of twenty minutes; and (b) suitably equipped to supply the necessary emergency services including rescue and first aid treatment for all personnel on the installation in the event of an emergency. (2) If the support craft exceeds the distance referred to in paragraph (1)(a), both the installation manager and the person in charge of the support craft shall log this fact and the reason why the distance or time was exceeded. (3) Under the direction of the installation manager, the support craft crew shall keep the craft in close proximity to the installation, maintain open communication channels with the installation and be prepared to conduct rescue operations during any activity or condition that presents an increased level of risk to the safety of personnel or the installation.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.