Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315

Section 7

Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 7 · current to January 19, 2026 · regulation last amended December 31, 2009

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) If the application for authorization covers a production installation, the applicant shall also submit to the Board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in Part 7. (2) The Board shall approve the flow system, the flow calculation procedure and the flow allocation procedure if the applicant demonstrates that the system and procedures facilitate reasonably accurate measurements and allocate, on a pool or zone basis, the production from and injection into individual wells.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.