Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 65
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 65 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The operator shall ensure that
(a) maximum recovery from a pool or zone is achieved in accordance with good oilfield practices;
(b) wells are located and operated to provide for maximum recovery from a pool; and
(c) if there is reason to believe that infill drilling or implementation of an enhanced recovery scheme might result in increased recovery from a pool or field, studies on these methods are carried out and submitted to the Board.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.