(1) Unless otherwise included in the approval issued under subsection 7(2), the operator shall ensure that the rate of flow and the volume of the following are measured and recorded:
(a) the fluid that is produced from each well;
(b) the fluid that is injected into each well;
(c) any produced fluid that enters, leaves, is used or is flared, vented, burned or otherwise disposed of on an installation, including any battery room, treatment facility or processing plant; and
(d) any air or materials injected for the purposes of disposal, storage or cycling, including drill cuttings and other useless material that is generated during drilling, well or production operations.
(2) The operator shall ensure that any measurements are conducted in accordance with the flow system, flow calculation procedure and flow allocation procedure, approved under subsection 7(2).
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.